background image

PNEG-1781

Field Installation of Sidekick™
Moisture Sampler Kit

Installation Manual

PNEG-1781

Version: 2.0

Date: 03-09-16

Содержание PNEG-1781

Страница 1: ...PNEG 1781 Field Installation of Sidekick Moisture Sampler Kit Installation Manual PNEG 1781 Version 2 0 Date 03 09 16...

Страница 2: ...dekick Moisture Sampler Kit All information illustrations photos and specifications in this manual are based on the latest information available at the time of publication The right is reserved to mak...

Страница 3: ...Sidekick Moisture Sampler Kit 3 Contents Chapter 1 Safety 4 Safety Guidelines 4 Safety Instructions 5 Chapter 2 Decals 7 Chapter 3 Installation 8 Remove Previous Moisture Sampler 8 Installing the Side...

Страница 4: ...WARNING CAUTION CAUTION This is the safety alert symbol It is used to alert you to potential personal injury hazards Obey all safety messages that follow this symbol to avoid possible injury or death...

Страница 5: ...refully followed in all cases Authorities having jurisdiction should be consulted before installations are made Follow Safety Instructions Carefully read all safety messages in this manual and safety...

Страница 6: ...ear gloves to protect your hands from sharp edges on plastic or steel parts Wear steel toed boots to help protect your feet from falling debris Tuck in any loose or dangling shoestrings A respirator m...

Страница 7: ...ment Gardez les mains loign es L omission de faire ceci pourra r sulter de s rieuses blessures DC 1944 GSI Group 217 226 4421 WARNING ADVERTISSEMENT DC 1947 Rotating auger will crush and cut Auto equi...

Страница 8: ...ive sheave on the unload auger shaft 4 Detach the rear bearing from the discharge box and slide off shaft 5 Detach the tilt switch from its cord and pull the cord out of the assembly after loosening t...

Страница 9: ...ing 2 Next install the rear auger stub D at the other end of the discharge auger See Figure 3B Figure 3B 3 The new rear discharge with moisture sampler can now be bolted in the same location as the pr...

Страница 10: ...e two 2 sheaves taking note of the arrows to indicate direction 7 Run electric cord back into conduit and attach the tilt switch 8 Place the moisture sensor in place on the sampling column and use the...

Страница 11: ...SUCH PRODUCTS GSI shall not be liable for any direct indirect incidental or consequential damages including without limitation loss of anticipated profits or benefits The sole and exclusive remedy is...

Страница 12: ...refully followed in all cases Authorities having jurisdiction should be consulted before installations are made GSI Group 1004 E Illinois St Assumption IL 62510 0020 Phone 1 217 226 4421 Fax 1 217 226...

Отзывы: