INSTALLATION
16
PNEG-1521
Commercial Direct Gear Drive Bin Sweep Auger
4. UNLOAD TUBE ASSEMBLY INSTALLATION
(Cont.)
5/16” Serrated
Flange Nuts
Connecting Band
5/16” x 1 -1/2”
Hex Bolts
E. Position the Unload Tube flush against the
Centerwell tube.
Unload Tube
Centerwell Tube
F. Slide the Connecting Band until it is equally
positioned over both the Unload Tube and the
Centerwell tube. Position the Connecting Band so
that it will not interfere with the control rods.
G. Secure the Connecting Band with three
(3) 5/16" x 1-½” Hex bolts and Serrated Flange
nuts, making sure the Intermediate Wells are
level with the Centerwell.
FIG. 4-C
FIG. 4-D
Содержание PNEG-1521
Страница 47: ...PARTS LIST 47 PNEG 1521 Commercial Direct Gear Drive Bin SweepAuger PARTS SECTION ...
Страница 52: ...PARTS LIST 52 PNEG 1521 Commercial Direct Gear Drive Bin SweepAuger INTERMEDIATE INSIDE WELL PARTS ...
Страница 56: ...PARTS LIST 56 PNEG 1521 Commercial Direct Gear Drive Bin SweepAuger BIN FLANGE PARTS AND CONTROL PIPES ...