![GSI Group PNEG-1445 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/gsi-group/pneg-1445/pneg-1445_assembly-and-operation-manual_2275206038.webp)
38
PNEG-1445 6", 8", 10", & 12" Custom Augers
6. START-UP
NEVER operate augers empty for any length of time as excessive wear will result.
8. Do not stop or start augers under load, especially before the flight and tube become well
polished, as this may cause the auger to “lockup”.
Excessive wear will result if auger is run at speeds in excess of what is recommended.
9. Do not run auger at to slow speed, this will load up or over load the auger. An loading up of
the auger will cause the motor to over load and a higher torque will be required to turn the
auger, which in turn may cause damage to the auger.
CAUTION
CAUTION
Содержание PNEG-1445
Страница 1: ...PNEG 1445 6 8 10 12 Custom Augers Assembly Operation Manual PNEG 1445 Date 05 08 07...
Страница 2: ...2 PNEG 1445 6 8 10 12 Custom Augers...
Страница 42: ...42 PNEG 1445 6 8 10 12 Custom Augers NOTES...
Страница 44: ...44 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 6 Custom Auger Parts...
Страница 46: ...46 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 8 Custom Auger Parts...
Страница 48: ...48 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 8 Internal Bearing Parts...
Страница 50: ...50 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 10 Custom Auger Parts...
Страница 52: ...52 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 10 Internal Bearing Parts...
Страница 54: ...54 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 12 Custom Auger Parts...
Страница 56: ...56 PNEG 1445 6 8 10 12 Custom Augers 9 PARTS LIST 12 Internal Bearing Parts...