4. Assembly
16
PNEG-1049
10"-12" Commercial Bin Sweep Augers
5. When installing the bin sweep in the bin, put two (2) 1" flat washers onto the post of the pivot yoke.
Place the drive assembly onto the center well pivot tube.
Figure 4E Drive Assembly to Center Pivot
6. Attach the discharge flight to the connecting shaft on the drive assembly using two (2) 1/2" x 3-1/2"
grade 8 hex bolts and stover nuts. The discharge flight is distinguished by the absence of flight ribbon
at one end. This end gets attached to the drive assembly.
Figure 4F Discharge Flight to Drive
Содержание PNEG-1049
Страница 40: ...40 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...
Страница 42: ...8 Parts List 42 PNEG 1049 10 12 Commercial Bin Sweep Augers Motor Rods to Drive...
Страница 44: ...8 Parts List 44 PNEG 1049 10 12 Commercial Bin Sweep Augers 10 12 Drive Assembly...
Страница 46: ...8 Parts List 46 PNEG 1049 10 12 Commercial Bin Sweep Augers 3 1 Aluminum Enclosed Drive...
Страница 54: ...54 PNEG 1049 10 12 Commercial Bin Sweep Augers NOTES...