- 11 -
STC 160
4.3 m
akinG
a
potential
equalisation
(pe)
The pre-installed PE connection terminal in position
1
can be relocated to
position
2
(fig. 8).
1
2
Fig. 8
• Dismount the PE connection terminal so that it can be moved.
• Mount the PE connection terminal (according to fig. 9) in position
2
as
shown in fig. 8.
Housing
Fig. 9
Caution
Tighten the nut until the teeth on the lock washer have penetrated the exterior
coating and a good connection is made between the housing and PE connec-
tion terminal.
Содержание GSS STC 160
Страница 1: ...Assembly Instruction STC 160 ...