English (GB) Installation and operating instructions

Original installation and operating instructions.

CONTENTS

Page

1. Symbols used in this document

2. General description

Grundfos pumping stations are pre-fabricated pumping stations 
for collection and pumping of drainage water, rainwater or 
wastewater.

The pump pit is made of PE-HD (polyethylene) and comes with 
discharge pipes and valves fitted.

The pipework is made of PE or stainless steel depending on the 
location of the pit and the pumped liquid, and thus the pump 
selected.

Unless another solution is selected, the pits up to 

1000 mm are 

supplied with a PE-HD cover which is locked with a special M10 bolt.

Fig. 1

Example of version

3. Applications

Grundfos pumping stations are used for collection and pumping 
of drainage water, rainwater and wastewater. Wastewater is led 
into the pit. When the liquid in the pit reaches the starting level, 
the pump will start and pump the liquid further in the system to a 
sewage treatment plant or sewer.

The pits are prepared for various pumps depending on the 
pumped liquid.

3.1 Pumped liquids

Drainage water

rainwater (surface water)

wastewater.

3.1.1 Liquid temperature

Maximum 40 °C. For higher temperatures, contact Grundfos.

3.1.2 Acids and alkalis

The pump pit is resistant to strong acids and alkalis as well as 
solvents. 

The pumps are supplied with the pump pit and normally stand pH 
values between 4 and 10. In case of doubt, contact Grundfos.

3.1.3 Viscosity

Very thick wastewater must not be led into the pit. See also the 
installation and operating instructions of the pump.

3.1.4 Density

Maximum 1.1 tons/m

3

.

1.

Symbols used in this document

6

2.

General description

6

3.

Applications

6

3.1

Pumped liquids

6

4.

Identification

7

4.1

Type key, PUST04 - PUST10

7

4.2

Type key, PUST17

7

4.3

Nameplate

7

5.

Pit versions

7

5.1

Cover

9

5.2

Vent pipe

9

5.3

Cables

9

6.

Technical data

9

6.1

Weight

9

7.

Sizing

9

8.

Transportation

9

9.

Installation

10

9.1

Pipe connection

11

9.2

Fitting the sleeve

12

9.3

Installation of pump

12

9.4

Pipework with flange connections

12

9.5

Fitting the chain

12

10.

Pump control

12

10.1 Start and stop levels

12

10.2 Installation of level controller

12

10.3 Float switches

13

10.4 Rod electrodes

13

10.5 Air bells

13

10.6 Pressure transducer

13

10.7 Other types of level control equipment

13

11.

Electrical connection and start-up

14

12.

Maintenance

14

13.

Service contract

14

14.

Disposal

14

Warning

Prior to installation, read these installation and 
operating instructions. Installation and operation 
must comply with local regulations and accepted 
codes of good practice.

Warning

If these safety instructions are not observed, it 
may result in personal injury!

Caution

If these safety instructions are not observed, it 
may result in malfunction or damage to the 
equipment!

Note

Notes or instructions that make the job easier 
and ensure safe operation.

TM

02

 9

3

66

 24

04

Pos.

Description

1

Pump

2

Chain

3

Guide rails

4

Float switch

5

Non-return valve

6

Stop  valve

7

Flange/coupling

8

Connection, 1/2" internal thread

9

Cover

Caution

The liquid temperature depends on the pump 
selected. See the installation and operating 
instructions of the individual pumps.

9

7

6

4

2

1

8

5

3

Содержание PUST04

Страница 1: ...t be led into the pit See also the installation and operating instructions of the pump 3 1 4 Density Maximum 1 1 tons m3 1 Symbols used in this document 6 2 General description 6 3 Applications 6 3 1...

Страница 2: ...inless steel AISI 304 Prepared for pump type KP Unilift KP Unilift CC AP35 Unilift AP12 40 Unilift AP35 AP50 Unilift AP12 50 Unilift AP50 APB Unilift AP35B Unilift AP50B DPEF DP 0 6 1 5 kW EF DPSE DP...

Страница 3: ...B 8 TM02 9364 2404 TM02 9363 2404 Fig 3 Pit with free standing pump Fig 4 Pit with pump on auto coupling TM02 9366 2404 TM02 9365 2404 Fig 5 Pit with pump on wall mounted auto coupling Fig 6 Pit with...

Страница 4: ...viest standard pit weighing approximately 1000 kg 7 Sizing The pit volume depends on the wastewater flow rate and the pump performance If the liquid in the pit is static during long periods sediments...

Страница 5: ...The backfill must meet the same requirements as those for the bedding layer The backfilling must be carried out so that the pit is not damaged or deformed The backfill must be compacted in layers of m...

Страница 6: ...cutting edge of the hole saw by at least 23 mm The position of the hole is not an issue See fig 17 Fig 17 Drillilng from the inside Caution If the hole for the pit is drilled pay special attention to...

Страница 7: ...he start level switch should be installed in such a way that the pump is started at the required level however the pump must always be started before the liquid level reaches the lower edge of the bot...

Страница 8: ...lse generators for the pressure switches of the controller and function by means of pneumatic pressure changes The pressure changes when the liquid level in a pickup changes The air bells are connecte...

Страница 9: ...oduct or parts of it must be disposed of in an environmentally sound way 1 Use the public or private waste collection service 2 If this is not possible contact the nearest Grundfos company or service...

Отзывы: