13.2.1 Oil level and oil condition

Check the oil level after one month of operation if the pump is 
new or the shaft seals have been replaced. The oil should be 
changed if it contains water.

Completely pump out the used oil, making sure that the removal 
tube goes all the way to the bottom of the oil chamber. 
For complete drainage, the pump must be tilted 60 °. 
After refilling, tighten the oil plug to torque (59 ft-lb).

13.2.2 Cable entry

Make sure that the cable entry is waterproof and that the cables 
are not sharply bent or pinched.

13.2.3 Propeller/impeller clearance

Check the propeller/impeller clearance.

13.2.4 Pump parts

Check the suction and discharge casing, etc. for possible wear. 
Replace defective parts.

13.2.5 Bearings

Check the shaft for noisy or heavy operation (turn the shaft by 
hand). Replace defective ball bearings.
A general overhaul of the pump is usually required in case of 
defective ball bearings or poor motor function. This work must be 
carried out by an authorized service workshop. 

13.3 Replacing the wear ring, KPL

When the clearance between the propeller blade and the wear 
ring exceeds 0.078 in. (20 mm), the wear ring must be replaced.
1. Remove the screws and lift the pump off the suction casing.
2. Replace the wear ring.
3. Assemble the pump in reverse order.
If you have any questions, please contact the nearest Grundfos 
or service workshop.

13.4 Replacing the wear ring, KWM

When the clearance between the impeller blade and the wear ring 
exceeds 0.078 in. (20 mm), the wear ring must be replaced.
1. Remove the screws and lift the pump off the suction casing.
2. Replace the wear ring.
3. Assemble the pump in reverse order.
If you have any questions, please contact the nearest Grundfos 
or service workshop.

Note

Note

If the pump has a WIO sensor, the above 
requirement can be ignored

Warning
If there has been leakage through the seal, the oil 
chamber may be under pressure. 
Always unscrew the oil plug slowly in order to 
allow pressure to equalize, and preferably hold a 
rag over the inspection cover when unscrewing 
the screw to prevent spillage.

Note

Note

Used oil must be disposed of in accordance with 
local regulations.

Note

Note

Inspection is recommended after one week of 
operation when the pump is new or the shaft 
seals have been replaced.
Regular inspection and preventive maintenance 
ensure a more reliable operation.

Содержание KPL

Страница 1: ...GRUNDFOS INSTRUCTIONS KPL KWM 15 to 1060 Hp Installation and operating instructions...

Страница 2: ...o instructed GRUNDFOS WILL NOT BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES LOSSES OR EXPENSES ARISING FROM INSTALLATION USE OR ANY OTHER CAUSES THERE ARE NO EXPRESS OR IMPLIED WARRANTIES INC...

Страница 3: ...the following flood and stormwater control drainage irrigation of large quantities of water raw water intake transfer of liquids in large scale municipal sewage treatment plants circulation of large...

Страница 4: ...eplate supplied with the pump should be affixed at the installation site Fig 3 Nameplate Note Note When pumping liquids with a density and or a kinematic viscosity higher than the values stated above...

Страница 5: ...power Hp 4 6 8 10 12 14 16 18 Number of poles 4 pole 6 pole 8 pole 10 pole 12 pole 14 pole 16 pole 18 pole T Number of phases Three phase motor 50 60 Frequency 50 Hz 60 Hz 9 11 13 15 17 19 21 Hydraul...

Страница 6: ...irection from its normal position BS EN 809 1998 A1 2009 Fig 5 Single wire lift Fig 6 Double wire lift base support Fig 7 Double wire lift Warning Pump installation in pits must be carried out by spec...

Страница 7: ...ry The pump should be periodically cleaned and sprayed with corrosion inhibiting oil The pump should always be stored under cover in a protected area not exposed to direct sunlight If the pump is stor...

Страница 8: ...n pipe 2 Installing the column pipe Slowly lower the column pipe into the pit using overhead lifting equipment Make sure that the column pipe is vertical and rests securely on the concrete Tighten the...

Страница 9: ...h only The cable suspension system may be adapted to the specific pump model Fig 9 Securing the cable to the lifting wire TM05 5940 4212 D Turnbuckle Sensor cable Power cable Intermediate lifting ring...

Страница 10: ...o connect all three stator thermal sensors if bearing sensors are also connected Fig 11 Switches and sensors of KPL Fig 12 Switches and sensors of KWM TM03 9460 4007 Warning The ground earth lead is g...

Страница 11: ...ion 11 Electrical connection They must also be connected to the safety circuit of the separate pump controller Technical data of moisture switches Two conductors operating voltage of switch 12 250 VAC...

Страница 12: ...or IO 113 Publication no 98097396 One pump can be connected to an IO 113 Together with the sensors IO 113 forms a galvanic separation between the motor voltage in the pump and the controller connected...

Страница 13: ...s ought to be fulfilled Consequences should be considered Requirements The thermal protection of the motor must be connected Peak voltage and dU dt must be in accordance with the table below The value...

Страница 14: ...earth lead is at least two inches longer than the other leads after connection This is to ensure that if the cable is accidentally pulled out the ground earth lead connection will be the last to be d...

Страница 15: ...er Replace worn parts if they impair function Check the clearance between the propeller impeller and the wear ring It must not exceed 0 078 in 20 mm Pumped liquid in oil chamber Warning If there has b...

Страница 16: ...the propeller blade and the wear ring exceeds 0 078 in 20 mm the wear ring must be replaced 1 Remove the screws and lift the pump off the suction casing 2 Replace the wear ring 3 Assemble the pump in...

Страница 17: ...ontact an authorized electrician d The phase currents are unbalanced or too high Contact an authorized electrician e The insulation between the phases and between phases and ground earth in the stator...

Страница 18: ...English US 18 15 Dimensions 15 1 KPL dimensional sketch Fig 16 Dimensional sketch KPL TM05 5941 4212...

Страница 19: ...L 7495 3400 118 2998 KPL 40 120 12 T 60 L 5754 2610 113 2871 KPL 40 175 12 T 60 L 5930 2690 113 2871 KPL 40 215 12 T 60 L 7187 3260 118 2998 KPL 48 215 14 T 60 L 9303 4220 132 3353 52 57 1336 46 85 11...

Страница 20: ...English US 20 15 2 KWM dimensional sketch Fig 17 Dimensional sketch KWM TM05 8751 2613 I D1 H L D2 D3...

Страница 21: ...38 97 990 35 82 910 37 79 950 KWM 40 300 8 T 60 H 6834 3100 110 04 2795 KWM 40 335 8 T 60 H 7407 3360 116 94 2970 KWM 40 215 10 T 60 M 7429 3370 121 85 3095 52 75 1340 25 60 650 38 97 990 35 82 910 3...

Страница 22: ...57 1000 1450 24 610 12 305 43 55 1100 1400 55 67 1400 1700 28 712 14 356 51 69 1300 1750 65 83 1650 2100 32 813 16 407 55 83 1400 2100 71 98 1800 2500 36 915 18 458 59 100 1500 2550 77 118 1950 3000...

Страница 23: ...Fig 20 Installation dimensions KPL pump ACC installed Fig 21 Installation dimensions KPL pump Fig 22 Installation dimensions KPL pump TM05 9452 3813 TM05 9453 3813 D C S M W L D C S M W L TM05 9454 38...

Страница 24: ...55 1100 1400 55 67 1400 1700 28 712 14 356 15 7 400 51 69 1300 1750 65 83 1650 2100 32H 16 407 16 7 425 55 83 1400 2100 71 98 1800 2500 32M 16 483 17 3 440 55 83 1400 2100 71 98 1800 2500 36 915 18 45...

Страница 25: ...KWM pump Fig 27 Installation dimension KWM pump Fig 28 Installation dimension KWM pump Fig 29 Installation dimensions KWM pump TM05 9457 3813 TM05 9458 3813 D C I S M W L D C I S M W L TM05 9459 3813...

Страница 26: ...roduct or parts of it must be disposed of in an environmentally sound way 1 Use the public or private waste collection service 2 If this is not possible contact the nearest Grundfos company or service...

Страница 27: ...ine starting DOL three power cables Fig 4 Star delta starting Y D one power cable TM05 6180 4512 TM05 6181 4512 V1 W1 U1 M 3 PE Control cable L1 L2 L3 PE V1 W1 U1 PE M 3 V2 W2 U2 PE Control cable L1 L...

Страница 28: ...COM WIO M M Symbol Description Symbol Description Thermal switch Pt100 sensor Moisture switch Earth lead Water in oil sensor T M WIO TM05 9585 4514 PE T1 T2 G1 A1 G2 A2 K1 K2 R1 R2 D1 D2 D3 D4 D5 D6...

Страница 29: ...00 B S L B S H COM1 MS TP B P5 P4 MS TP B COM2 M M Symbol Description Thermal switch Moisture switch Pt100 sensor Earth lead Water in oil sensor M T WIO PE T1 T2 G1 A1 G2 A2 K1 K2 R1 R2 D1 D2 D3 D4 D5...

Страница 30: ...30...

Страница 31: ...ace Olathe KS 66061 Phone 1 913 227 3400 Fax 1 913 227 3500 www grundfos us Canada GRUNDFOS Canada 2941 Brighton Road Oakville Ontario L6H 6C9 Canada Phone 1 905 829 9533 Telefax 1 905 829 9512 www gr...

Страница 32: ...ECM 1137521 The name Grundfos the Grundfos logo and be think innovate are registered trademarks owned by Grundfos Holding A S or Grundfos A S Denmark All rights reserved worldwide Copyright Grundfos...

Отзывы: