7
3. G 400 module
The G 400 modules incorporate a back-up battery for
short power cuts.
The internal battery can be switched off with a switch
on the front of the G 400. The switch is used when
inserting the SIM card and during transportation and
storage.
When starting up, the internal battery must be con-
nected by pushing the switch to the right.
For switch position, see fig. 2.
On delivery, the battery is completely or partly dis-
charged. It is recommended to allow the G 400 to
charge for min. 2 hours before the GSM communica-
tion is started.
TM
0
3
1
484
/
148
5 2
2
0
5
Pos.
Description
Function
1
Indicator lights
Status indication
2
GSM/GPRS antenna connection
Connection of external antenna
3
GENIbus connection
Connection of other GENIbus products
4
USB plug
Updating of software in the G 400
5
Switch for internal back-up battery
Switching off the internal battery during transporta-
tion and when updating of the G 400
6
Connection of power supply (PU 101)
and UPS (PU 102)
Power supply (PU 101) and UPS (PU 102)
7
SIM card
SIM card for GSM modem
8
Release button
Opening the SIM card drawer
9
Ethernet
Connection to CU 401 or service PC
10
RS-232
Connection to RS-232 cable
1
2
3
4
7
6
5
8
9
10
Содержание G 401
Страница 1: ...G 401 G 402 G 403 G 404 G 405 G 406 GRUNDFOS INSTRUCTIONS Installation and operating instructions...
Страница 4: ...4...
Страница 19: ...180...
Страница 20: ...181...
Страница 21: ...182...