background image

English (GB)

3

1.3 Notes

The symbols and notes below may appear in 
Grundfos installation and operating instructions, 
safety instructions and service instructions.

2. Receiving the product

The product is supplied from the factory in a proper 
packing in which it must remain until it is to be 
installed. Make sure that the product cannot roll or 
fall over.
If the product is not going to be installed immediately, 
the free end of the power cable or the sensor cables 
must be protected from moisture which could 
otherwise penetrate the motor windings. This must 
be done as soon as the product is received.
Protection can be carried out by fitting a cable cap or 
by wrapping the free end of the cable in plastic and 
taping over the plastic with strong waterproof tape.

2.1 Inspecting the product

After receiving and before installing the product, 
check the following points:

Check that the pump corresponds to the order.

Check that accessories and other equipment are 
not damaged during transport.

3. Installing the product

Before beginning the installation, check that the 
pump is suitable for the supply voltage and 
frequency available at the installation site.

For safety reasons, all work in pits must be 
supervised by a person outside the pump pit.
Pits for submersible sewage and wastewater 
products contain sewage and wastewater with toxic 
and/or disease-causing substances. Therefore, all 
persons involved must wear appropriate personal 
protective equipment and clothing and all work on 
and near the product must be carried out under strict 
observance of the hygiene regulation in force.

Observe these instructions for explosion-
proof products.

A blue or grey circle with a white graphical 
symbol indicates that an action must be 
taken.

A red or grey circle with a diagonal bar, 
possibly with a black graphical symbol, 
indicates that an action must not be taken 
or must be stopped.

If these instructions are not observed, it 
may result in malfunction or damage to the 
equipment.

Tips and advice that make the work easier.

DANGER

Electric shock

Death or serious personal injury
- Before beginning the installation, switch 

off the power supply and lock the main 
switch in position 0.

- Before working on the pump, switch off 

any external voltage connection to the 
pump.

CAUTION

Sharp element

Minor or moderate personal injury
- Wear protective clothing (gloves) when 

working on the pump.

Observe all safety regulations at the 
installation site, for instance the use of 
blowers for fresh-air supply to the pit.

Product installation in pits must be carried 
out by specially trained persons.
Work in or near pits must be carried out 
according to local regulations.

Содержание DWK O.10.80.37

Страница 1: ...DWK Installation and operating instructions GRUNDFOS INSTRUCTIONS Installation and operating instructions DWK http net grundfos com qr i 97515233...

Страница 2: ...odes 8 4 2 Checking the direction of rotation 9 4 3 Preparing for startup 10 4 4 Startup 10 5 Handling and storing the product 10 5 1 Handling 10 5 2 Storing the product 10 6 Product introduction 11 6...

Страница 3: ...outside the pump pit Pits for submersible sewage and wastewater products contain sewage and wastewater with toxic and or disease causing substances Therefore all persons involved must wear appropriat...

Страница 4: ...must be rated for the purpose and checked for damage before any attempts are made to lift the product The lifting equipment rating must under no circumstances be exceeded CAUTION Crushing hazard Mino...

Страница 5: ...t of the pump outlet If a rigid pipe is used fit the union or coupling non return valve and isolating valve in the order mentioned when viewed from the pump If the pump is installed in muddy condition...

Страница 6: ...will cause a motor stop in case of high temperature in the motor The thermal switch must be connected to the control wire of the power cable inside the pump and to the safety circuit of the separate...

Страница 7: ...tar delta starting TM04 4096 0709 TM04 4097 3316 L1 L2 L3 MCCB V A MCCB MC Md My THR GU 01 GU 02 E U1 V1 W1 W2 U2 V2 1 M 3 T P T P S S S S S S F L MC T T My Md MC AUX THR THR MC OL RL GL AUX 6 5 GU01...

Страница 8: ...ication The actual effect cannot be predicted The acoustic noise level may increase See the installation and operating instructions for the frequency converter used for advice as to how to reduce the...

Страница 9: ...peration 4 2 Checking the direction of rotation Check the direction of rotation in the following way every time the pump is connected to a new installation Proceed as follows 1 Remove the pump from th...

Страница 10: ...e pump Store the pump in a vertical position on a pallet or a stand to keep the pump off the floor and facilitate easy removal Coil up the cable and seal the open end tightly with waterproof plastic a...

Страница 11: ...ded use 6 4 Approvals The standard version of the DWK pumps has been tested by T V according to EC Council Machinery Directive 2006 42 EC registration no AM 50143413 and report no 13009106 001 TM04 41...

Страница 12: ...t 5 50 Hz Frequency Hz 6 60 Hz 0D 380 415 V DOL Voltage and starting method 1D 380 415 V Y D 0E 220 240 V DOL 1E 220 240 V Y D Standard Pump version R Cast iron2 Z Custom built variant Customisation T...

Страница 13: ...witch which is optional is for high level alarm For further information see the installation and operating instructions for the pump controller selected 7 3 GU01 and GU02 GU01 is a monitoring device f...

Страница 14: ...rate See section 8 4 3 Checking the outlet pressure and flow rate Seal sensor resistance See section 8 4 4 Inspecting the seal sensor Oil level and oil condition See section 8 4 5 Oil check and oil ch...

Страница 15: ...ing hole pointing downwards in order to drain the pump of oil If the drained oil is contaminated or opaque this is an indication of an impending mechanical shaft seal failure Replace the mechanical se...

Страница 16: ...with the specifications on the pump nameplate 2 Increased current consumption due to large voltage drop Measure the voltage between two motor phases Tolerance 5 5 3 The impeller is blocked by impuriti...

Страница 17: ...liquid level 10 1 9 Max altitude above sea level 2000 m 10 2 Dimensions and weights 10 2 1 Dimensions See Dimensions and weights in the appendix 11 Disposing of the product This product or parts of i...

Страница 18: ...65 202 39 DWK O 6 50 15 Hose 468 235 110 50 215 428 492 65 202 41 Flange 468 276 110 50 215 428 520 65 202 41 DWK O 6 50 22 Hose 488 235 110 50 215 448 512 65 202 45 Flange 488 276 110 50 215 448 540...

Страница 19: ...09 179 100 333 734 872 116 302 110 DWK O 13 100 75 Hose 358 179 100 333 734 852 116 302 156 Flange 409 179 100 333 734 872 116 302 156 DWK O 13 100 110 Hose 358 179 100 333 779 897 116 302 190 Flange...

Страница 20: ...612 1318 1411 220 557 846 Flange 532 306 150 612 1318 1561 220 557 858 DWK E 10 150 550 Hose 532 306 150 612 1318 1411 220 557 909 Flange 532 306 150 612 1318 1561 220 557 921 DWK E 10 200 300 Hose 43...

Страница 21: ...0 530 DWK H 7 100 300 0 1161 1410 1180 470 100 580 DWK H 7 100 370 10 1350 1595 1445 518 100 800 DWK H 7 150 450 10 1350 1595 1445 518 150 830 DWK H 7 150 550 10 1350 1595 1445 518 150 850 DWK H 7 150...

Страница 22: ...1 51 E mail info_GDK grundfos com www grundfos com DK Estonia GRUNDFOS Pumps Eesti O Peterburi tee 92G 11415 Tallinn Tel 372 606 1690 Fax 372 606 1691 Finland OY GRUNDFOS Pumput AB Trukkikuja 1 FI 013...

Страница 23: ...hona 421 2 5020 1426 sk grundfos com Slovenia GRUNDFOS LJUBLJANA d o o Lesko kova 9e 1122 Ljubljana Phone 386 0 1 568 06 10 Telefax 386 0 1 568 06 19 E mail tehnika si grundfos com South Africa Grundf...

Страница 24: ...550 Trademarks displayed in this material including but not limited to Grundfos the Grundfos logo and be think innovate are registered trademarks owned by The Grundfos Group All rights reserved 2019 G...

Отзывы: