17
Instructions
EZ Boost
TM
System
4.3. EZ Boost Quick Installation Guide
FOR MORE DETAILED INSTALLATION INSTRUCTIONS, PLEASE
GO TO SECTION 6.
1. Install BMQE pump.
2. Install EZ Boost controller.
PE
PE
POWER
PUMP
1
2
3 4
+24V
IN
GN
D
SENSOR
1
2
3
4
2. Install EZ Boost controller.
3. Install diaphragm tank.
3. Install diaphragm tank.
4. Install pressure sensor.
4. Install pressure sensor.
5. Connect incoming power, BMQE pump, and
pressure sensor to EZ Boost controller.
PE
PE
POWER
PUMP
1
2
3 4
+24V
IN
GN
D
SENSOR
5. Connect incoming power, BMQE pump and
pressure sensor to EZ Boost controller.
1
2
3
4
6. Close EZ Boost controller cover.
7. Switch on main power.
6. Close EZ Boost controller cover
7. Switch on main power.
Red light
is on
1. Install BMQE pump.
Note:
The BMQE pump must be installed with the air relief vent
in the 12 o’clock position when installed horizontally, and when
installed in the vertical position, the air vent must be at the top
of the unit.
LEZTL001.indd
10/13/2004, 1:24 PM
17
Содержание 15 BMQE 05A-110
Страница 34: ...LEZTL01 indd 10 8 2004 1 39 PM 34...