background image

4

CONTENTS

Page

1.

General description

4

1.1

Applications

4

2.

Preinstallation

4

2.1

Well preparation

4

2.2

Make sure you have the right pump

4

2.3

Pumped liquid requirements

4

2.4

Motor cooling requirements

5

2.5

Liquid temperatures/cooling

5

2.6

Motor preparation 

5

2.7

Refilling of motor liquid

5

3.

Installation positions

6

3.1

Positional requirements

6

4.

Electrical connection

6

4.1

General

6

4.2

Motor protection 

6

4.3

Connection of motor

6

5.

Cable sizing

7

6.

Splicing the cable 

7

7.

Fitting the cable plug to the motor 

7

8.

Fitting the cable guard

8

9.

Piping

8

10.

Installing the pump

9

10.1

Installation depth

9

11.

Generator operation

9

12.

Starting the pump for the first time

10

12.1

Motor cooling and other considerations

10

12.2

Impurities in the water

10

12.3

Minimum flow rate

10

12.4

Built-in protection

10

12.5

Resetting the pump

10

12.6

MS 3 motors

10

12.7

MSE 3 motors

10

12.8

Maintenance and service

10

13.

Assembly of pump and motor

11

14.

Troubleshooting

12

14.1

Instruments not allowed

13

15.

Checking of motor and cable 

13

16.

Environment

13

17.

Disposal

13

18.

Technical data

14

1. General description

The SQ/SQE is a 3 inch diameter submersible pump 
mainly designed for the pumping of raw water in do-
mestic water supply. This manual is designed to assist 
in the proper set-up, installation and operation of 
these pumps.

1.1 Applications

Typical applications are:
• residential housing
• small waterworks
• pressure boosting
• irrigation systems
• liquid transfer in tanks.

2. Preinstallation

2.1 Well preparation

If the pump is to be installed in a new well, the well 
should be fully developed and bailed or blown free of 
cuttings and sand. 
The construction of the Grundfos SQ/SQE submersi-
bles makes them resistant to abrasion; however, no 
pump made of any material can forever withstand the 
destructive wear that occurs when constantly pump-
ing sandy water.
If this pump is used to replace an oil-filled submers-
ible or oil-lubricated line-shaft turbine in an existing 
well, the well must be blown or bailed clear of oil.

2.2 Make sure you have the right pump

Determine the maximum depth of the well and the 
drawdown level at the maximum pump capacity. 
Pump selection and setting depth should be made 
based on this data.

2.3 Pumped liquid requirements

Submersible well pumps are designed for pumping 
clear, cold water; free of air or gases. Decreased pump 
performance and life expectancy can occur if the wa-
ter is not clear, cold or contains air or gases. 
The water temperature should not exceed 104°F.
A check should be made to ensure that the installa-
tion depth of the pump will always be at least three 
feet below the maximum drawdown level of the well. 
The bottom of the motor should never be installed 
lower than the top of the well screen or within five 
feet of the well bottom.

Before beginning installation procedures, 
these installation and operating instruc-
tions should be studied carefully. The in-
stallation and operation should also be in 
accordance with local regulations and ac-
cepted codes of good practice.

Содержание 10SQ-110

Страница 1: ...SQ SQE Installation and operating instructions GRUNDFOS INSTRUCTIONS...

Страница 2: ...ce under this warranty the defective product must be returned to the distributor or dealer of Grundfos products from which it was purchased together with proof of purchase and installation date failur...

Страница 3: ...3 SQ SQE Installation and operating instructions Page 4...

Страница 4: ...works pressure boosting irrigation systems liquid transfer in tanks 2 Preinstallation 2 1 Well preparation If the pump is to be installed in a new well the well should be fully developed and bailed or...

Страница 5: ...rundfos motor liquid type SML 2 which will pro tect the motor liquid down to 4 F 20 C and prevent the growth of bacteria The level of motor liquid is im portant for the operating life of the bearings...

Страница 6: ...10 6 50 60 Hz The current consumption can only be measured accu rately by means of a true RMS instrument If other in struments are used the value measured will differ from the actual value The SQE pum...

Страница 7: ...ctrical putty tightly around each Sta Kon The putty should overlap on the insulation of the wire 7 Use a good quality tape such as 33 Scotch Water proof or Plymouth Rubber Company Slipknot Grey Wrap e...

Страница 8: ...g 8 Fitting the cable guard to the pump suction strainer 9 Piping The pump should only be gripped by the two flats at the top of the pump see fig 9 The pump can be installed vertically or horizontally...

Страница 9: ...that the dynamic water level should always be above the pump 6 Loosen the safety wire so that it becomes un loaded and lock it to the well seal using a cable clamp 7 Complete the electrical connection...

Страница 10: ...effective only within the recommended duty range of the pump Note Do not let the pump run against a closed dis charge valve for more than 5 minutes When the dis charge valve is closed there is no coo...

Страница 11: ...the motor 4 Screw the pump end on the motor 55 Nm Note The pump shaft must engage with the mo tor shaft A spanner may be used on the clamping faces of the pump end see fig 12 5 Fit the cable guard as...

Страница 12: ...y choked by impurities iron bacteria Clean or replace the discharge pipe d The check valve of the pump is blocked Pull the pump and clean or replace the valve e The pump and the riser pipe are partly...

Страница 13: ...st High voltage test M V 1 Supply voltage TM00 1371 5092 Measure the voltage L1 RMS between phase and L2 Connect the voltmeter to the terminals at the connections The voltage should when the motor is...

Страница 14: ...NPT 22 30 SQ SQE 1 NPT Storage conditions Minimum ambient temperature 4 F Maximum ambient temperature 140 F Freeze protection Note The motor must not be stored without being filled with motor liquid I...

Страница 15: ...PT 10SQ SQE 290 1 0 230 3 15 3 1 NPT 10SQ SQE 330 1 5 230 3 15 3 1 NPT 15SQ SQE 70 0 5 230 115 4 20 3 1 NPT 15SQ SQE 110 0 5 230 115 4 20 3 1 NPT 15SQ SQE 150 0 75 230 4 20 3 1 NPT 15SQ SQE 180 0 75 2...

Страница 16: ...500 Canada GRUNDFOS Canada Inc 2941 Brighton Road Oakville Ontario L6H 6C9 Phone 1 905 829 9533 Telefax 1 905 829 9512 Mexico Bombas GRUNDFOS de Mexico S A de C V Boulevard TLC No 15 Parque Industrial...

Страница 17: ......

Страница 18: ...Being responsible is our foundation Thinking ahead makes it possible Innovation is the essence www grundfos com L SP TL 017 R 5 06 US R PRINTED IN USA...

Отзывы: