READ THIS DOCUMENT BEFORE YOU BEGIN

Thank you for purchasing this GrowSpan™ greenhouse. 

When properly assembled and maintained, this product will  

provide years of reliable service. These instructions include 

helpful hints and important information needed to safely 

assemble and properly maintain the greenhouse. Please 

read these instructions 

before

 you begin.

If you have any questions during the assembly, contact 

Customer Service at 1-800-245-9881 for assistance.

SAFETY PRECAUTIONS

•  Wear eye protection.
•  Wear head protection.
•  Wear gloves when handling metal tubes.
•  Use a portable GFCI (Ground Fault Circuit Interrupter) 

when working with power tools and cords.

•  Do not climb on the greenhouse or framing during or 

after construction.

•  Do not occupy the greenhouse during high winds,  

tornadoes, or hurricanes.

•  Provide adequate ventilation if the structure is  

enclosed.

•  Do not store hazardous materials in the greenhouse.
•  Provide proper ingress and egress to prevent  

entrapment. 

ANCHORING INSTRUCTIONS

Prior to assembling this greenhouse, please read the 

MUST READ

 document included with the shipment. 

WARNING:

 The anchor assembly is an integral part 

of the greenhouse construction. Improper anchoring 

may cause greenhouse instability and failure of the 

structure. Failing to anchor the greenhouse properly 

will void the manufacturer’s warranty

 and may cause 

serious injury and damage.

LOCATION

Choosing the proper location is an important step before 

you begin to assemble the structure.  

The following suggestions and precautions will help you  

determine whether your selected location is the best  

location. 
•  Never erect the structure under power lines.
•  Identify whether underground cables and pipes are  

present 

before

 preparing the site or anchoring the    

structure.

•  Location should be away from structures that could  

cause snow to drift on or around the building.

•  Do not position the greenhouse where large loads 

such as snow and ice, large tree branches, or other 

overhead obstacles could fall.

• 

Always check local building codes before you begin. 

SITE

After choosing a location, proper preparation of the site is 

essential. The following site characteristics will help ensure 

the integrity of the structure.
• 

A level site is required

. The site must be level to  

properly and safely erect and anchor the structure.

•  If the site is not level, use footings to provide a secure 

base to assemble the structure. Pre-cast concrete 

blocks, pressure-treated wood posts, or poured 

footings are all acceptable when properly used. (Some 

shelters use ground posts or base plates.)

•  Drainage: Water draining off the structure and from  

areas surrounding the site should drain away from the  

site to prevent damage to the site, the structure, and  

contents of the structure.

WARNING:

 The individuals assembling this structure 

are responsible for designing and furnishing all  

temporary bracing, shoring and support needed during 

the assembly process. For safety reasons, those who 

are not familiar with recognized construction methods 

and techniques 

must seek the help of a qualified  

contractor.

DOUBLE-LAYER FILM INSTALLATION

Greenhouses equipped with a double-layer film include 

a layer that is Infra Red (IR) Retention film. 

IMPORTANT!

 

During cover installation, the IR film 

must be installed first! Examine the film and install 

it according to the instructions printed on the film.

Содержание Round Pro

Страница 1: ...20 W x 10 7 H x 20 L 104854 20 W x 10 7 H x 24 L 104855 20 W x 10 7 H x 36 L 104856 20 W x 10 7 H x 48 L 2019 GrowSpan All Rights Reserved Reproduction is prohibited without permission Photo may show...

Страница 2: ...u determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or ancho...

Страница 3: ...ladding and door 12 Install roof cladding 13 Read the care and maintenance information in next column 14 Complete and return all warranty documents as instructed SHELTER CARE AND MAINTENANCE Proper ca...

Страница 4: ...tal and polycarbonate panels Wrenches and impact socket set or an adjustable wrench Scissors utility knife or tin snips Hammers rubber mallet and gloves Flat bar or putty knives for panel installation...

Страница 5: ...l Spring CC6212 Fabric Clip FA4482B Tek Screw QH1402 Band Clamp 102548 Cross Connector 104074 Square to Round Tube Connect Bracket 102856 End Clamp FAH009B FALB01B Carriage Bolt Hex Nut 103496 Gearbox...

Страница 6: ...does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 7: ...oss connectors and purlins Ground Post Purlins Frame shown may differ slightly from actual frame Strut GrowSpan Round Pro Greenhouses and Systems OVERVIEW This section describes assembling your greenh...

Страница 8: ...st 6 Repeat the same step for the last corner post NOTE The distance measured diagonally between corner posts must be equal for the building to be square 7 Check all dimensions and adjust if needed be...

Страница 9: ...assemble the first end rafter and arrange on a level surface 2 Slide three 3 end purlin clamps over the rafter pipes 20R1601D 20R1601 20R1602 NOTE Consult the Front Profile diagram in the Quick Start...

Страница 10: ...rafters do not use end clamps Instead cross connectors are attached during the frame assembly 2 Insert the swaged ends of the rafter pipes into the plain ends of the pipes and secure each joint with...

Страница 11: ...ground posts Brace the rafter in place to keep it straight Depending on the frame size a lift and additional assistants may be needed Consult Quick Start section for details Rafter shown differs in d...

Страница 12: ...fter 13 Repeat steps to add purlin pipe 131S075 and cross connectors to secure interior rafter to frame assembly 7 Tighten the end clamp and secure it to the rafter with a Tek screw Secure purlin pipe...

Страница 13: ...erify you have correctly assembled purlins using correct pipes before cutting any pipe to length Review Side Profile diagram for you building in Quick Start section 20 Return to each pipe splice of ea...

Страница 14: ...section for additional details 2 Attach strut upper end to end rafter band clamp Install clamp if needed Adjust strut position so lower end of strut reaches band clamp on second rafter Install that b...

Страница 15: ...showing polycarbonate panel locations and locations of aluminum trim and profile before repositioning any end wall vertical DO NOT MOVE END WALL VERTICALS USED AT THE SEAM OF TWO 2 POLYCARBONATE PANEL...

Страница 16: ...mark length determined in Step 9 above and subtract amount needed to account for square to round tube connect bracket which is attached to top of frame tube See diagram that follows 12 Select a square...

Страница 17: ...Center of Door Frame Tube 17 Using a level or other means plumb one door frame tube and tighten band clamp bolt to secure 18 Choose square tube for header and cut swaged end to proper length for widt...

Страница 18: ...ll screws bolts and clamps so they will not damage the end wall panels when panels are attached to the end wall frame End Rafter 27 Verify vertical frame member is plumb and use short Tek screws to se...

Страница 19: ...o required lengths and attach to construct base tube 2 Attach vertical frame supports at top and bottom as previously described 3 Continue by installing end panels TAPE SHARP EDGES AND CONNECTORS Afte...

Страница 20: ...fter removing protective film if needed ATTENTION Remove protective film from panels before installation Do not allow film to remain intact and in direct sunlight doing so will make film difficult if...

Страница 21: ...stalled and cut to fit then apply foil tape to seal open cells at top as described above Flashing is installed after panel installation is complete ATTENTION Remove protective film from panels before...

Страница 22: ...Diagram shows basic panel installation and fasteners used to secure polycarbonate panels Install H channel with flat side out Complete these general steps to install end panels 1 Consult panel locatio...

Страница 23: ...along remaining side of door B Install 104213 u profile to finish bottom edge of panels at base tube B A END PANEL INSTALLATION continued 6 Continue to prepare and install panels and aluminum profile...

Страница 24: ...e of lower panels if this is not completed yet 10 Apply foil tape DH8007 to cover open cells of all panels along radius of end rafter See arrows below END PANEL INSTALLATION continued 11 Repeat proced...

Страница 25: ...25 GROWSPAN ROUND PRO GREENHOUSES AND SYSTEMS Revision date 01 23 19 Reserved for Customer Notes...

Страница 26: ...USES AND SYSTEMS 26 Revision date 01 23 19 QUICK START GUIDE 20 Round Pro Greenhouse 20 0 5 8 Width 10 3 5 16 Height Grid Represents 12 Squares FRONT Ground Level Frame shown may differ in length from...

Страница 27: ...27 GROWSPAN ROUND PRO GREENHOUSES AND SYSTEMS Revision date 01 23 19 FRONT PROFILE 102675 1 90 Ground Post 102675 1 90 Ground Post 20R1601D 20R1601D 20R1602 20R1601 Ground Level...

Страница 28: ...OUND PRO GREENHOUSES AND SYSTEMS 28 Revision date 01 23 19 SIDE PROFILE 104853 20 0 Length Purlin Run 3 131S075 1 131P0255 4 0 on center Rafter Spacing center to center Customer Supplied Baseboard Gro...

Страница 29: ...N ROUND PRO GREENHOUSES AND SYSTEMS Revision date 01 23 19 SIDE PROFILE 104854 24 0 Length Purlin Run 3 131S075 1 131P0735 4 0 on center Rafter Spacing center to center Customer Supplied Baseboard Gro...

Страница 30: ...OUND PRO GREENHOUSES AND SYSTEMS 30 Revision date 01 23 19 SIDE PROFILE 104855 Purlin Run 5 131S075 1 131P0735 36 0 Length 4 0 on center Rafter Spacing center to center Customer Supplied Baseboard Gro...

Страница 31: ...N ROUND PRO GREENHOUSES AND SYSTEMS Revision date 01 23 19 SIDE PROFILE 104856 Purlin Run 7 131S075 1 131P0735 4 0 on center Rafter Spacing 48 0 Length center to center Customer Supplied Baseboard Gro...

Страница 32: ...MS 32 Revision date 01 23 19 CONNECTIONS Endwall Baserail Connection View 3 Vertical Horizontal Connection View 4 Endwall Rafter Connection View 5 Purlin End Rafter Connection View 1 Purlin Mid Rafter...

Страница 33: ...ter Connection 102856 1 66 Purlin End Connector Rafter Purlin 102548 1 66 Cross Connector Rafter Purlin Horizontal Rail QH1330 Endwall 104624 1 Way Connector Baserail Endwall View 3 Endwall Baserail C...

Страница 34: ...M FRONT VIEW 92 1 4 INSIDE DIM 98 1 4 C L C L 22 7 8 C L C L 22 7 8 C L C L 48 C L C L 25 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL E...

Страница 35: ...RAME DIAGRAM BACK VIEW 22 7 8 C L C L 22 7 8 C L C L 48 C L C L 25 C L C L 25 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING T...

Страница 36: ...does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 37: ...OLY 4 X 8 POLY ONE HALF 4 X 8 POLY ONE HALF 4 X 8 POLY 6 X 10 POLY 6 X 10 POLY 4 X 8 POLY EXCESS TRIMMED AND USED HERE H CHANNEL U CHANNEL NOTE INSTALL UV PROTECTED SIDE OF PANEL TO THE OUTSIDE Ground...

Страница 38: ...01 23 19 POLYCARBONATE PANELS BACK VIEW 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 6 X 10 POLY 6 X 10 POLY 4 X 8 POLY EXCESS TRIMMED AND USED HERE H CHANNEL NOTE INSTALL UV PROTECTED SIDE OF PANEL TO...

Страница 39: ...39 GROWSPAN ROUND PRO GREENHOUSES AND SYSTEMS Revision date 01 23 19 Space below is reserved for customer notes...