Revision date: 01.01.20

ATTACH END PANELS

CAUTION:

 To prevent damage, do not install end 

panels on a windy day. 

Gather the parts:
•  End Panels 3-Zip (Zippered)
•  Fabric Clips #CC6212 (Evenly space at 24" on-center.)
•  Measuring tape
•  Scissors or similar cutting tool 

1.  Spread an end panel out on the ground at the desired 

end of the frame and center the end panel as needed.

2.  With the proper lift (or ladders) positioned inside the 

frame, pull the end panel up and over the top of the 

end rafter.

3.  Secure the end panel to the backside of the end rafter 

at the top, center position using a fabric clip and Tek 

screw.

4.  Moving outward in both directions, continue attaching  

fabric clips to secure the end panel to the rafter. 

Evenly space the fabric clips at approximately 24" 

intervals and work toward the ground.

5.  Pull the lower edge of the panel under the end conduit 

and secure each corner flap to the inside of the conduit 

using a fabric clip and Tek screw. 

 

NOTE:

 If needed, remove or loosen the two Tek screws 

on the angled brackets so the end panel can be pulled 

under the end conduit. With the panel in place reattach 

the conduit and secure the end panel to it.

6.  Repeat the steps to secure the other end panel to the 

frame as previously described. 

NOTE:

 The end panels may be shipped as untrimmed 

rectangular pieces. If so, use scissors to trim the 

excess end panel material from inside the frame after 

attaching the panels to the end rafters. 

MAIN COVER INSTALLATION

After the end panels are installed, install the main cover. 

The steps to install the main cover include:
1.  Attach poly latch U-Channel (102197) along the high 

tunnel sides and tops of the high tunnel end rafters 

using FA4482B Tek screws.

2.  Pull main cover over the frame. 
3.  Attach the main cover to the end rafters using the poly 

latch springs.

4.  Stretch and attach main cover to the sides of the frame.
5.  Install roll-up side kits and test the operation of the 

twist-of-the-wrist assembly.

INSTALL POLY LATCH U-CHANNEL (102197)

1.  Measure the desired height (4'-5') to identify the top 

of the roll-up sides. Attach the poly latch channel at 

approximately 4'-5' above the ground on both sides of 

the frame. 

 

RECOMMENDED:

 Attach a ribbon board 

(2" x 4" 

or 2" x 6")

 to the rafters and then attach the poly 

latch U-channel (102197) to the ribbon board using 

customer-supplied wood screws.  

NOTE:

 Ribbon board and baseboard (recommended) 

shown in the diagram above 

are not included

 and are 

supplied by the customer

. Use the supplied FAH009B 

(1/4" x 4") carriage bolts and FALB01B (1/4") nuts to 

secure the ribbon board and U-Channel to the rafter. 

Use customer-supplied wood screws to secure 

U-channel to ribbon board. Do not use Tek screws 

to attach U-Channel to wood.

 

 

NO RIBBON BOARD: 

Attach one section of the poly 

latch U-Channel to the side of the frame using Tek 

screws. Attach U-Channel flush with the outside edge 

of the end rafter at each end of the assembled frame.

Ribbon Board

Rafter

4'-5'

Frame shown may 

differ from actual 

frame.

Содержание Round Premium PB01660R4

Страница 1: ...hoto may show a different but similar model 2020 GrowSpan All Rights Reserved Reproduction is prohibited without permission STK DIMENSIONS PB01660R4 14 W x 10 H x 24 L PB01662R4 14 W x 10 H x 36 L PB0...

Страница 2: ...manufacturer s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and pre...

Страница 3: ...in cover if equipped This applies to fabric covers that stretch over the frame assembly Your shelter may include roof panels or side panels or both 11 Read the Care and Maintenance information at the...

Страница 4: ...ed for buildings with roll up sides Materials for baseboards and ribbon boards are not included and are supplied by customer ATTENTION Fasteners to secure boards to building frame are included Recomme...

Страница 5: ...nd Plain Rafter Sections 102569 Bearing 102717 Gearbox Drive 102198 U Channel Spring 102197 Poly Latch U Channel 102570 Aluminum Channel Zippered End Panel QH1400 Band Clamp FRAME ASSEMBLY NOTE During...

Страница 6: ...Premium High Tunnel For details please see section Assembling the Round Premium High Tunnel Components See illustration below to identify main parts of high tunnel 1 Locate the required parts for each...

Страница 7: ...he remaining posts to the required height 8 After all corner posts are accurately installed tie a string line between the tops of the corner ground posts on the same side of the shelter The string is...

Страница 8: ...in ground post Install the screws so they will not touch the cover once it is installed This is typically on the backside of the rafter which will be the surface visible from the inside of the high tu...

Страница 9: ...r length and one 1 1 315 x 73 5 131P0735 plain pipe 8 Continue adding rafters and purlin pipe until the frame is assembled Secure all purlin splices using Tek screws See Step 10 9 Finish the purlin ru...

Страница 10: ...Angle Bracket Tek Screws View from inside of the shelter Customer Supplied Wood Screws BASEBOARD INSTALLATION RECOMMENDED Gather the parts Treated or recycled plastic lumber supplied by customer Reco...

Страница 11: ...y cause serious injury and damage STRUT ASSEMBLY PROCEDURE After the frame is assembled attach a diagonal strut to the brace band and to the baseboard Gather the parts Struts 5 QH1304 5 16 x 1 1 2 lag...

Страница 12: ...al from inside the frame after attaching the panels to the end rafters MAIN COVER INSTALLATION After the end panels are installed install the main cover The steps to install the main cover include 1 A...

Страница 13: ...me sizes WARNING To prevent damage to the cover and to prevent serious personal injury DO NOT attempt to install the main cover on windy or stormy days 1 Unpack the main cover and position it at the b...

Страница 14: ...first end rafter until the entire length of the end of the main cover is secured in place 7 Stretch the cover to the other end of the building and repeat the steps to secure the main cover in the U Ch...

Страница 15: ...of the Wrist assembly and attach it to the frame and the roll up side 4 Install the Anti Billow Rope system 5 Test the operation of the roll up side 4 Place the assembled conduit at the base of the si...

Страница 16: ...Verify that the lower end of the channel is slightly off the ground to allow it to move freely when the panel is rolled up and down 5 Secure the upper end of the channel by drilling a 3 8 hole through...

Страница 17: ...m channel from the ground end This is the free end of the channel 13 Roll the cover conduit up to the Twist of the Wrist assembly 14 Attach the conduit to the square shaft of the assembly by inserting...

Страница 18: ...nance information that follows NOTE If the poly latch U Channel was attached to a ribbon board as suggested the eyebolt can be mounted through the poly latch channel and ribbon board to the inside of...

Страница 19: ...anytime Remove debris and objects that may accumulate on the cover Use tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not dama...

Страница 20: ...ELS 20 Revision date 01 01 20 QUICK START GUIDE 14 Wide Round Premium High Tunnels Frame shown may differ in length from actual frame Height 14 0 9 10 11 16 Width 1 10 11 16 Sidewall Height Grid Repre...

Страница 21: ...GROWSPAN ROUND PREMIUM HIGH TUNNELS 21 Revision date 01 01 20 FRONT PROFILE 14R1301 14R1301 14R1303 14R1302 102676 102676 End 102855 Middle 102479 131S027D 131S027D...

Страница 22: ...AN ROUND PREMIUM HIGH TUNNELS 22 Revision date 01 01 20 SIDE PROFILE PB01660R4 24 0 Length 3 131S075 1 131P0735 Purlin Cover Conduit Customer Supplied Baseboard 4 0 on center Rafter Spacing center to...

Страница 23: ...AN ROUND PREMIUM HIGH TUNNELS 23 Revision date 01 01 20 SIDE PROFILE PB01662R4 36 0 Length 5 131S075 1 131P0735 Purlin Cover Conduit Customer Supplied Baseboard 4 0 on center Rafter Spacing center to...

Страница 24: ...AN ROUND PREMIUM HIGH TUNNELS 24 Revision date 01 01 20 SIDE PROFILE PB01664R4 7 131S075 1 131P0735 Purlin Cover Conduit 4 0 on center Rafter Spacing 48 0 Length center to center Customer Supplied Bas...

Страница 25: ...ter Purlin Connection 102479 Purlin Rafter View 2 Mid Rafter Purlin Connection QH1400 QH1304 Rafter View 3 Rafter Strut Connection View is seen from inside of the shelter End Rafter Purlin Connection...

Отзывы: