LAY OUT THE BUILDING SITE

After the site is prepared, lay out the building site.

Drive ground posts to the proper depth. The top of the post 

will be one (1) foot above the finished grade when properly 

driven.

 

Width of the frame is measured from the center of 

one ground post to the center of the remaining ground post.

SQUARE THE SITE

Gather the parts:
•  Ground posts 

(Use top hole when attaching rafter.)

•  5/16" x 2-1/2" Machine bolts (FAG336B) 
•  5/16" Nuts (FALB02B)
1.  Identify a corner where a ground post will be positioned 

and drive the first ground post into the ground.  

 

NOTE: 

Insert the ground post driver into the top of 

the ground post to protect the post and drive the post 

into the ground. 

The top of the post will be one (1) foot 

above the finished grade when properly driven.

 

 

Position the pre-drilled holes facing to the inside/

outside of the high tunnel so they can be aligned with 

the bolt holes in the rafter legs. 

4.  String a line at least as long as the building from the 

first stake at 90°. 

 

NOTE:

 A transit can be used to ensure an accurate 90°  

angle, or the 3-4-5 rule can be used. Refer to diagram.  

Using multiples of 3-4-5 such as 6-8-10 or 12-16-20  

helps to maintain an accurate 90° angle.

5.  After squaring the position of the building, measure 

the length (center-to-center) and drive the next corner 

ground post.

6.  Repeat the same step for the last corner post. 

 

NOTE:

 The distance measured diagonally between 

corner posts must be equal for the building to be 

square.

7.  Check all dimensions (and adjust if needed) before 

driving the remaining posts to the required height.

8.  After all corner posts are accurately installed, tie a 

string line between the tops of the corner ground posts 

on the same side of the frame. The string is used to 

identify the tops of all remaining ground posts. The 

string must remain tight and level.

9.  Use a tape measure to mark the on-center locations 

of the remaining ground posts. 

See the Side Profile 

diagrams in the Quick Start section for your frame.

10. Drive the remaining ground posts into the ground at the 

required on-center rafter spacing and frame width and 

the height identified by the string. 

 

NOTE:

 Verify that the holes in the ground posts are in 

the proper position and that each post is plumb and 

driven to the correct depth.

11.  Continue with the 

Rafter Assembly

 steps that follow.

To align the bolt holes in the ground posts with those 

in the rafter 

after driving the ground posts,

 insert a 

tapered rod or pry bar into a ground post bolt hole and 

turn the post using the rod or pry bar.

2.  After the first corner ground post is in place, string a 

line the width of the building (center-to-center) and 

drive the second ground post into the ground just 

enough to hold it in place.

3.  Use a transit or another method to position the second 

post, and to drive the post the same depth as the first 

ground post.

Outside of 

Frame

Inside of 

Frame

Ground 

Post

Attach rafter 

using this 

mounting 

hole

Содержание Gothic Premium 108185H

Страница 1: ...you are completing the correct steps for your building The cover installation steps for buildings with a film cover or a 5 2 oz fabric cover are the same 2021 All Rights Reserved Reproduction is prohi...

Страница 2: ...ge LOCATION Choosing the proper location is an important step before you begin to assemble the structure Follow these requirements Never erect the structure under power lines Identify whether undergro...

Страница 3: ...s to the main frame install the panel and attach the anti billow ropes 14 Read the care and maintenance information at the end of these instructions 15 Complete and return all warranty information as...

Страница 4: ...ustomer Supplied End Framing Installation In areas where loose or sandy soil conditions are found or where deep frost is common setting the customer supplied end frame posts in concrete is recommended...

Страница 5: ...th the next A customer supplied two piece ribbon board is required for the drop down panel Fasteners are included Customer supplies the materials for the ribbon board Minimum board requirements are sh...

Страница 6: ...ose in sandy soil when concrete is not used Minimum board requirements are shown in the diagrams below If a ribbon board is not used attach the 104211 double u channel directly to the rafters along th...

Страница 7: ...k material used to cover the open areas of the end frame and door frame See End Panel Location diagram in the Quick Start section of this guide DD084HxxxCN52 This number identifies the panels used for...

Страница 8: ...d continue as instructed Do not cut the film of the HC model to install ridge vent kit CUSTOMER SUPPLIED END FRAME Construct the end frame for the roll up end panel using 4 x 4 wood posts The doorfram...

Страница 9: ...he same step for the last corner post NOTE The distance measured diagonally between corner posts must be equal for the building to be square 7 Check all dimensions and adjust if needed before driving...

Страница 10: ...nd arrange on a level surface 2 Slide one 1 end purlin clamp 102856 onto the peak rafter pipe and one clamp onto each leg pipe Position end clamps on the rafter pipes as shown 3 Insert the swaged end...

Страница 11: ...Depending on the frame size a lift and additional assistants may be needed Consult Quick Start section for details Rafter shown differs in design ATTENTION Stand the rafter so the end clamp nuts and...

Страница 12: ...n position DO NOT USE THE REMAINING END RAFTER ATTENTION Do not add a band clamp A band clamp is only added to the end rafters and the first interior rafters at either end of the frame 13 Secure the r...

Страница 13: ...es 3 Using the diagram below and the Side Profile diagram in the Quick Start section as guides position a purlin diagonally and secure to each rafter it crosses using pipe straps and Tek screws NOTE B...

Страница 14: ...d for drop down sides Position strut so it will not interfere with the installation of the baseboard Ground Level 2 Attach one end of the strut to the band clamp as shown in the diagram below Strut En...

Страница 15: ...he boards Customer supplies baseboard material Minimum lumber dimension is 2 x 6 Use treated lumber if allowed by local codes for your application Always check codes before purchasing treated lumber A...

Страница 16: ...were driven into place and not set in concrete read the information on this page and anchor the high tunnel before continuing Ground Level Ground post below grade Anchor Kit Components Ground post ab...

Страница 17: ...2 DOOR HEIGHT GROUND TO BOTTOM OF HEADER 116674 ENDWALL HEADER KIT 26 WIDE GOTHIC PREMIUM HIGH TUNNEL additional purchase required If the 116674 endwall header kit was purchased for this high tunnel c...

Страница 18: ...OTE Use recognized construction practices when setting the customer supplied 4 x 4 posts 2 After setting the posts install the header Consult the End Framing Connections Details diagram in the Quick S...

Страница 19: ...e DCC4931 Material Consult the End Panel Location diagram near the back of this manual to view the areas that need to be covered with end panel material Use these steps to cut and attach the end panel...

Страница 20: ...g side 4 Inspect the frame assembly for sharp edges or clamps and bolts that may interfere with the installation of the side panels File or tape sharp edges as needed Reposition clamps if needed 5 Con...

Страница 21: ...w in each channel and into each rafter See the diagram that follows 2 Continue attaching the u channel sections to the ribbon board or rafters for no ribbon board and work toward the other end of the...

Страница 22: ...OF HIGH TUNNEL Raw 5 2 oz Cover Material End of the cover positioned at the end of the frame Position ridge vent holes here at each end Center Line RIDGE VENT KIT INSTRUCTIONS The optional Ridge Vent...

Страница 23: ...o the template as shown above Space the three 3 holes 9 on center 9 24 12 3 VENT HOLE TEMPLATE Center Line Length Cover Cover Width 3 0 Step 2 Step 1 9 9 3 3 Edge of Cover Center Line Cover 9 9 3 Step...

Страница 24: ...asurements to ensure you are pulling the cover onto the frame correctly Complete these steps 1 Take the cover and position it at the frame base along one side NOTE Unfold cover and locate edge Cover g...

Страница 25: ...OTECTION WHEN INSTALLING SPRING WIRE Step 3 Step 5 7 4 Center side to side and end to end 5 Once main cover is in place and centered begin at the peak at one end and install the 102198A wire spring in...

Страница 26: ...FOR DROP DOWN SIDES all CD FD models CONTINUE WITH THE INSTALL THE DROP DOWN SIDES PROCEDURE FOR ROLL UP SIDES all CRU FRU models CONTINUE WITH THE INSTALL THE ROLL UP SIDES PROCEDURE 8 Move to the ot...

Страница 27: ...assembly See side profile for pipe identification if needed 106734 band clamp 103496 gearbox and 103544 mounting plate 102717 double drive FA4482B Tek screws for drive pipe FAH009B 1 4 x 4 carriage bo...

Страница 28: ...d to the end rafter take the 103496 gearbox and place it against the mounting plate at the desired angle 7 Using a marker trace the edges of the gearbox to mark the desired angle on the mounting plate...

Страница 29: ...of the second rafter using an FA4482B Tek screw Pipe should remain loose in the band clamp Band clamps support the drive pipe at each rafter except the end rafter where the gearbox is mounted 14 Take...

Страница 30: ...DOWN PANEL continued ATTACH DROP DOWN PANEL PULLEYS Locate these parts 131S075 pipe conduit CC5525 1 4 panel cord FA4652 Wood Screws AS5020 pulleys Duct tape Drop down panel Panel ID begins with DD C...

Страница 31: ...duit section in the pocket add another conduit to the first plain end over tapered swaged end secure joint using an FA4482B Tek screw and tape the conduit joint using duct tape 5 Complete the panel co...

Страница 32: ...for proper panel operation 13 Drive two 2 FA4482 Tek screws with neo bonded washers 102921 into the drive pipe where the cord is located Do not fully seat the Tek screws to the conduit Allow space to...

Страница 33: ...an installed drop down panel with all cords attached and the panel closed Actual high tunnel differs from the example shown INSTALL THE DROP DOWN PANEL continued Cord Pocket with Conduit Drive Pipe D...

Страница 34: ...retch the panel end to end along the baseboard 3 Take the first section of customer supplied retaining board and place it against the panel and the baseboard to hold the panel in position NOTE Evenly...

Страница 35: ...ide channel Upper end of guide can remain as shown or trimmed a few inches above mounting point See dashed line in photo Guide Channel End of channel to remain a few inches above ground to allow for m...

Страница 36: ...d bolts Gearbox can attach to either side of flat mounting bracket 3 Using a 1 4 x 2 carriage bolt FAH005B and nut FALB01B attach square shaft to a tubing adapter 4 Slide square shaft through the Twis...

Страница 37: ...billow ropes Corner Baffle Corner Baffle Complete these steps to install a baffle at each corner of the assembled frame 1 Locate four 4 pieces of 102197 single u channel additional 102198A spring wire...

Страница 38: ...of available u channel INSTALL CORNER BAFFLES continued 4 Take the 108654 roll of 6 mil film and cut a piece to cover the end bay opening framed by the single u channel Roll out the film and measure...

Страница 39: ...nel Conduit Pocket 104211 U channel position Baseboard NOTE Keep panel centered and stretched during this step 4 Secure panel in the lower channel using the 102198A u channel spring NOTE Begin at one...

Страница 40: ...procedure that follows to attach the conduit to the roll up side panels using fabric clips ATTACH CONDUIT TO ROLL UP SIDE PANEL Gather the parts Fabric clips CC6212 One for each rafter position Tek sc...

Страница 41: ...2 carriage bolt FAH005B through hole Add 1 4 nuts FALB01B and tighten 4 Test roll up curtain assembly and roll panel to fully opened upper position Do not allow to remain in lower position at this tim...

Страница 42: ...ne the location of rope hooks and the number of anti billow ropes for each side using the Side Profile diagram in the Quick Start section for your frame length 2 Attach the 117063 rope hooks using woo...

Страница 43: ...ram below Use five 5 hooks for each side TOP VIEW Photo shows the open end of the hook lag facing the end panels Door Frame 3 Tie a length of rope to the first grommet hole below the guide post bracke...

Страница 44: ...oward the ribbon board attached along the sides of the frame 2 Using the cover straps as a guide attach two 2 ratchets QH1061 to the board as shown in the following diagrams Roll Up Side Panel Predril...

Страница 45: ...place film when needed Remove snow to prevent excess accumulation Use tools that will not damage the cover when removing snow Check the contents of the high tunnel to verify that nothing is touching t...

Страница 46: ...GROWSPAN GOTHIC PREMIUM HIGH TUNNELS 46 108185_86_87_88_89H Revision date 01 08 21...

Страница 47: ...ial sku MATERIAL TO COVER END FRAME AND DOOR FRAME AREAS DCC4931 See dark shaded areas in diagram MATERIAL FOR THE ROLL UP DOOR PANELS QED108191 MATERIAL FOR DROP DOWN ROLL UP SIDES DD084HxxxCN52 WHER...

Страница 48: ...7_88_89H Revision date 01 08 21 FRONT PROFILE 102675 102675 26G166SS401D 166S099 26GT166P3 166S099 26G166SS401D 102856 End Rafter 102548 Mid Rafter 102856 End Rafter 102548 Mid Rafter 102856 End Rafte...

Страница 49: ...ATTENTION TO PREVENT DAMAGE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WILL RESULT IN A...

Страница 50: ...l ATTENTION TO PREVENT DAMAGE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WILL RESULT IN...

Страница 51: ...075 1 131P0735 11 131S075 4 131S075 Angle Purlin Assembly 1 131P027 Purlin Assembly QH1304 Strut Angle Purlin Assembly S on center on center pacing 4 0 Rafter 60 0 Length Drop Down Roll up Conduit Ass...

Страница 52: ...PREVENT DAMAGE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WILL RESULT IN A LOOSE SIDE P...

Страница 53: ...GE AND POSSIBLE INJURY INSTALL THE ANTI BILLOW ROPE IN SHORT LENGTHS ALONG EACH SIDE OF THE FRAME DO NOT INSTALL AS A SINGLE LENGTH TIED AT EACH END DOING SO WILL RESULT IN A LOOSE SIDE PANEL SHOULD T...

Страница 54: ...54 108185_86_87_88_89H Revision date 01 08 21 CONNECTIONS Rafter Ground Post Connection View 3 Purlin End Rafter Connection View 1 Purlin Mid Rafter Connection View 2 Rafter Angle Purlin Connection V...

Страница 55: ...Rafter View 5 Rafter Angle Purlin View 1 Connection Purlin Mid Rafter Rafter Ground Post View 2 Connection Purlin Rafter Purlin End Clamp 5 16 x 2 1 2 Bolt Rafter 5 16 Nut Supplied By Customer Ground...

Страница 56: ...uct the end wall frame as shown with the vertical jambs extending above the header 18 to 24 This provides an anchor point for cables if you decide to install them now or in the future Header CUSTOMER...

Страница 57: ...details on page 18 Threaded rod and rafter are not shown Roll up door panel is not shown 104188B 1 2 bolt FALB08B nut FAME09B washer FAK16 ROD cut FALB04B nuts FAME08B washer CUSTOMER SUPPLIED END FR...

Страница 58: ...Measure each area cut a section from the bulk DCC4931 material and attach the material to the end frame using FA4482B Tek screws and 102921B washers For best results cut a rectangular piece of materi...

Страница 59: ...4 3 4 1 0 0 3 10 1 2 4 3 4 1 0 0 6 5 3 4 6 5 3 4 Over The Top 44 10 5 8 538 5 8 Ground Level When installing the side purlins allow enough space above the clamps and purlin pipe to install the custome...

Страница 60: ...34 Band Clamp Pulley Rope Baseboard The above photo shows a typical drop down side panel as installed on a sample building This photo applies to buildings equipped with drop down sides only It does no...

Страница 61: ...panel frame to support the panel during winter months and strong winds Secure horizontal support using pins for easy removal Vertical bracing can remain throughout the year if spaced according to nee...

Отзывы: