8
Revision date: 02.17.17
4
Assembly Instructions
ATTACH COVER MATERIAL
Complete these steps:
1. Determine which direction you want to pull the cover material over the
shelter, position material along frame, and secure to frame.
NOTE:
Attaching a baseboard at ground level throughout the length
of the shelter and then securing cover material to that baseboard
is recommended. Contact your sales representative for additional
suggestions or to purchase additional materials. In some instances, it may
be best to pull the material over the frame, attach the edge to the building,
then attach the other edge to the canopy arms.
2. Take both pieces of the 8' u-channel (111948) and cut each one in half.
Shade Material
Step 1
Finished Grade
Customer-supplied
baseboard to secure
material to one side of
the building.
Shade Material
Attach material edge
here and at the other
end of the shelter.
113171
111948
3. Attach one piece of u-channel to each edge of fabric clamp (113171). See
the diagrams above.
The example shows a film-covered greenhouse where the shade material
is pulled over the building using the 113170 EZ-Shade Tarp Arm.
HINT:
With assistance, pull material over frame, attach one edge to
building, then attach remaining edge to each pivot arm.
DO NOT ATTEMPT TO PULL MATERIAL ON A WINDY OR STORMY
DAY OR WHEN SUCH CONTITIONS ARE EXPECTED.
Содержание 113170
Страница 11: ...11 Revision date 02 17 17 Customer Note Page...