background image

7

CANOPY-TOP COLD FRAMES

Revision date: 01.12.10

LAY OUT THE BUILDING SITE

After the site is prepared, identify the location of the shelter 

corners to help square the frame after it is assembled.

Taking these steps 

before

 assembling the shelter saves 

time and ensures that the structure is positioned as 

desired. The following procedure is a suggested method.

Its use depends on the size of the shelter, shelter 

application, the footings, and the method used to anchor 

the shelter.

SQUARE THE SITE

1.  Identify a corner where a building rafter will be  

positioned, drive in a stake, and string a line the exact  

width of the building and stake in place. 

2.  String a line at least as long as the building from the 

first stake at 90°. 

 

NOTE:

 A transit can be used to ensure an accurate 90°  

angle, or the 3-4-5 rule can be used. Refer to diagram.  

Using multiples of 3-4-5 such as 6-8-10 or 12-16-20  

helps to maintain an accurate 90° angle.

3.  After squaring the position of the building and placing  

a stake at all corners, string a line between the stakes  

to mark the base of the building.

4.  Next, paint or mark a line on the ground using the 

strings between the stakes as guides.

NOTE:

 If a baseboard 

is used, drill holes 

through the board at 

evenly-spaced intervals 

along the length of 

the board. Drive a rod 

through each hole and 

into the site to prevent 

the boards from shifting 

and to maintain the 

on-center width of the 

building.

Actual rafter is not shown.

Baseboard

Rod or Ground 

Stake 

NOTE:

 Setting 

customer-supplied baseboards 

on the site 

in the correct positions is another way to prepare for the 

frame assembly.  

The baseboards can be "pinned" in place using rods driven 

into the site through evenly-spaced holes drilled in the 

baseboard. This prevents the baseboards from shifting 

during assembly.  

Building width is measured on-center.

 

5.  After marking the outline of the building, continue with 

the assembly instructions.

Содержание 104176

Страница 1: ...Rights Reserved Reproduction is prohibited without permission GrowSpan Lean To Cold Frame Photo may show a different but similar model STK DIMENSIONS 104176 12 W x 10 L 104177 12 W x 20 L 104178 12 W...

Страница 2: ...nt step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under...

Страница 3: ...mbly read through the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assem...

Страница 4: ...steps will ensure that you have all the necessary parts before you begin to assemble the shelter frame 1 Unpack the contents of the shipment and place where you can easily inventory the parts Refer to...

Страница 5: ...e following graphics and photos will help you identify the different parts Some parts are not shown FA4482B Tek Screw Swaged Plain Swaged and Plain Rafter Sections 100441 Nut Setter 10016107 Combo Soc...

Страница 6: ...his section describes assembling your Lean To Cold Frame For details please see section Assembling the Cold Frame Components See illustration below to identify main parts of the cold frame 1 Locate th...

Страница 7: ...5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle 3 After squaring the position of the building and placing a stake at all corners string a line between the stakes to mark the base o...

Страница 8: ...es 08LT1601 and 08LT1602 Rafter pipe 166P096 Rafter pipe 166P065 Rafter pipe 166S051 Rafter pipe 166S044 Combo socket tee 10016107 Tek screws and nut setter Hex key Allen wrench 08LT1601 08LT1602 166S...

Страница 9: ...position Additional assistants are required to hold the inside rafter in position 5 center to center 4 Locate the pipes required for a purlin Refer to the Side Profile drawings in the Quick Start Gui...

Страница 10: ...reassembling For replacement or missing parts call 1 800 245 9881 for assistance NOTE With the exception of Truss Arch buildings GrowSpan shelters and greenhouses do not have any tested loading criter...

Страница 11: ...ES Revision date 01 12 10 QUICK START GUIDE 12 Wide Lean to Cold Frame Height 8 1 1 8 Width To Chord 12 0 7 6 9 10 9 16 Height FRONT Grid Represents 12 Squares Frame shown may differ in length from ac...

Страница 12: ...CANOPY TOP COLD FRAMES 12 Revision date 01 12 10 FRONT PROFILE 10016107 Quik Klamp Combo Socket Connection for tee 166P065 166S051 166S051 166P096 08LT1601 08LT1602 166S044...

Страница 13: ...13 CANOPY TOP COLD FRAMES Revision date 01 12 10 SIDE PROFILE 104176 1 166S099 1 166P024 10 0 length 5 0 on center Rafter Spacing center to center Purlin Run...

Страница 14: ...CANOPY TOP COLD FRAMES 14 Revision date 01 12 10 SIDE PROFILE 104177 2 166S099 1 166P048 20 0 Length Purlin Run 5 0 on center Rafter Spacing center to center...

Страница 15: ...15 CANOPY TOP COLD FRAMES Revision date 01 12 10 SIDE PROFILE 104178 30 0 Length 3 166S099 1 166P072 Purlin Run 5 0 on center Rafter Spacing center to center...

Страница 16: ...CANOPY TOP COLD FRAMES 16 Revision date 01 12 10 SIDE PROFILE 104179 4 166S099 1 166P096 Purlin Run 40 0 5 0 on center Rafter Spacing center to center...

Страница 17: ...17 CANOPY TOP COLD FRAMES Revision date 01 12 10 SIDE PROFILE 104180 5 0 on center Rafter Spacing 50 0 Length 6 166S099 1 166P024 Purlin Run center to center...

Страница 18: ...CANOPY TOP COLD FRAMES 18 Revision date 01 12 10 SIDE PROFILE 104181 60 0 Length 7 166S099 1 166P048 Purlin Run 5 0 on center Rafter Spacing center to center...

Страница 19: ...P COLD FRAMES Revision date 01 12 10 CONNECTIONS AND DETAILS Purlin Rafter 10016107 Quik Klamp Cross Connection Purlin Inserts Here for Mid Rafters Purlin Rafter Connection View 1 View 1 Purlin Rafter...

Отзывы: