CANOPY-TOP COLD FRAMES
6
Revision date: 01.12.10
Ground Level
Top Cross Rail
Purlin
Rafter Pipes
GrowSpan™
Lean-To Cold Frame
OVERVIEW
This section describes assembling your Lean-To Cold
Frame. For details, please see section, Assembling the
Cold Frame Components. See illustration below to identify
main parts of the cold frame.
1. Locate the required parts for each assembly procedure.
2. Assemble the rafters and frame.
3. Anchor the frame.
Actual frame may differ in length.
Leg