background image

Error 202

PV Voltage High

Too many PV panels 
connected in series

1.Immediately disconnect the
   DC switch and check the PV
   voltage.
2.If the fault code still exists 
   after the normal voltage is
  restored, contact manufacturer.

Error 203

PV Isolation Low PV panel insulation 

problem

1. Check PV panel and wiring.

Error 204

PV Reversed 

PV positive and 

negative are 

reversed

1.After shutdown, Check the

   inverter terminal.

2. Restart inverter.

3.If error message still exists,

   contact manufacturer.

Error 300

AC overvoltage

Grid voltage 
overvoltage

1.Check grid voltage.
2. If the error message still exists
   despite the grid voltage being
   within the spec range, contact
   manufacturer.

Error 301

AC reversed

AC wiring error

1.Check AC terminals.

2.If error message still exists,

   contact manufacturer.

Error 302

No AC 

Connection

No AC Connection

1.After shutdown, Check AC

   wiring.

2. If error message still exists,

    contact manufacturer.

Error 303

NE abnormal

N or PE wring error

1.Check PE wiring.
2.Check N wiring.

Error 304

AC F Outrange

Abnormal grid 

frequency

1. Restart inverter.

2. If error message still exists, 

   contact manufacturer.

Warning 

217

BDC Abnormal 

ARO battery error

1.Check ARO battery terminals

2.Check the connection.

   between the inverter and the 

   ARO battery.

Warning 

218

BDC Bus 

Disconnect

Inverter and BDC 

wiring failure

1. Check the wire connection

    between the inverter and the

    ARO battery.

2.If error message still exists,

   contact manufacturer.

ShineServer Operation 8

ShineServer is the online monitoring platform that allows remote access through the 

ShinePhone App or any web browser. However, the premise is that the Wi-Fi network has 

been configured.

Account and plant information will be the same in both the web browser version and on 
the ShinePhone App.

8.1 Register an Account

a)  Log in to our monitoring website http://server-us.growatt.com and click Register an
    Account.

b)  Fill in the appropriate information on the registration interface and log into the 
     account after the registration is completed.

8.2 Create a power plant

a)  When you log into your account for the first time, you will be prompted to register a

     power plant.
b)  Click Add Plant on the upper right hand corner to create a power plant. A single

     account can contain multiple power plants.

20

19

Содержание MIN 3 K-11.4K TL-XH-US

Страница 1: ...00 Download Manual Growatt New Energy Growatt USA Inc 9227 Reseda Blvd 435 Northridge CA 91324 USA 1 866 686 0298 www growatt america com T E usaservice ginverter com W MIN 3K 11 4K TL XH US Commissi...

Страница 2: ...rk 3 Grid Code Mapping Table 4 Wi Fi Network Configuration 5 Energy Management System 5 1 Management System Mode Introduction 5 2 Energy Management System setting 6 Battery Life Maintenance 7 Troubles...

Страница 3: ...Note Inverter MIN 3K 11 4KTL XH US Energy conversion ARO Battery ARO 6 6 9 9L C1 US Energy storage UP TO 4 ATS ATS 5K 11 4KT US EPS switching Smart meter SM US 200 Energy management Button RSD Button...

Страница 4: ...at also match the L1 to the inverter Make sure the CT of L2 matched L2 input of the Service Panel that also match the L1 to the inverter c Meter Wiring When connecting the meter to the inverter refer...

Страница 5: ...onnect the inverter with built in WIFI at close range We can view the inverter system information and system fouction settings with it 2 3 Connecting to Local Wi Fi Network The steps for using APP are...

Страница 6: ...nsuccessful and you will need to reconnect the build in WIFI of the inverter by turning off Wifi setting in the phone and turn on again OR power cycle the system Also keep the mobile phone within 3 me...

Страница 7: ...low voltage power grid 7 PRC Quebec 208 Canada Quebec low voltage power grid 8 PRC Quebec 240 Canada Quebec low voltage power grid 9 RULE21 208 US California low voltage power grid 10 RULE21 240 US Ca...

Страница 8: ...e power Maximum self consumption Use PV production for self consumption then charge discharge battery as needed to maximize self consumption Maximum self consumption Export Limit The power output from...

Страница 9: ...he AC charging is used to set whether to allow charging the battery from the Grid Factory Default is Disabled 1 Tap in Charge and Discharge Management 2 Find Enable AC Charging 3 Tap in ON OFF button...

Страница 10: ...the time period 7 If you need to set more quarter or time periods you need to operate step 4 5 6 multiple times You can also set the energy storage mode for special days if necessary 16 16 5 2 3 EMS M...

Страница 11: ...formation on the main interface if there are exist after installation The fault and alarm code on the ShineServer Page will be the same in the APP If you find a fault or alarm please click it and then...

Страница 12: ...frequency 1 Restart inverter 2 If error message still exists contact manufacturer Warning 217 BDC Abnormal ARO battery error 1 Check ARO battery terminals 2 Check the connection between the inverter...

Страница 13: ...just created enter the power plant page and then add a data logger The SN number of the collector is on the barcode on the side of the inverter starting with VC A power plant can contain multiple data...

Страница 14: ...on the home screen Fig 9 2 Icon of APP 9 2 APP Introduction Shinephone can remotely monitor the inverter system information which has the same function as shineserver and the two information are share...

Страница 15: ...ge display the list of plants under the plant account 8 tap in to add the Plant 25 Growatt USA Inc 9227 Reseda Blvd 435 Northridge CA 91324 USA 1 866 686 0298 www growatt america com T E usaservice gi...