6  Electrical Connection

The battery provides three network ports and four power terminals for electrical connection.

Terminals/Ports 

Type

Cable Cross-Section

Current Carrying Capacity

Grounding

M6

16mm²

 

+/-

M6

25mm² or 3AWG

100A

PCS/Link-In/Link-Out

RJ45

24AWGX8

 

                  

6.1  Prepare Cables

Before connecting the batteries, you need to prepare grounding wire with OT lugs to meet the 

requirements of your applications.

!

CAUTION

Cables can be made by yourself or purchased from qualified providers. 
It is recommended to purchase finished power wire products according to the terminal specifications of the battery. 

If you make cables on your own, please ensure that the terminals are crimped properly.

Make grounding wires with OT terminals.

Step 1 

Strip cable sheaths and put a piece of heat shrinking tube 

along the wire.

Grounding: 16 mm² 

Step 2 

Insert conductive wires into an OT terminal. 

M6 

  

Step 3 

Crimp the OT terminal with a hydraulic plier.

 

Содержание Hope 4.8L-C1

Страница 1: ...SHENZHEN GROWATT NEW ENERGY CO LTD Hope 4 8L C1 Lithium Iron Phosphate Battery Residential Energy Storage System Quick Guidance Date 2021 04 29...

Страница 2: ...trained to fully understand grid connected photovoltaic power system and national regional standards Installers must use insulating tools and wear safety equipment Device damages caused by noncomplia...

Страница 3: ...ttery away from fire source inflammable explosive and chemical materials Do not dispose of batteries in a fire Risks of electric shock Do not touch battery with wet hands Keep battery away from childr...

Страница 4: ...als No Label Name 1 PCS PCS communication port 2 Link Out Network port for parallel connection 3 Link In Network port for parallel connection 4 DO1 DO2 Two channel dry contact port 5 SOC Display the b...

Страница 5: ...rand and model 7 Real time battery information shown on inverter or inverter monitor system APP Voltage V Current A SOC Temperature 8 How long has the system been used Dead on arrival Under 6 months 6...

Страница 6: ...Wire stripper Hydraulic plier Tape measure FUSED FUSED 1000V MAX 10A 100mA COM V OFF V A A V Hz Multi meter Insulated gloves Safety goggles Rubber boots To prevent injury always wear acid resistant c...

Страница 7: ...ighly humid area Ensure direct contact between battery shell and ambient air and do NOT cover or shield battery 5 1 Battery Orientation The battery supports stackable installation with brackets At mos...

Страница 8: ...nto 2 pcs of brackets from the rear Step 3 Stack battery packs with brackets and fasten screws At most 8 battery packs can be stacked in this way Max 8 PACKs The battery stack can be placed in standin...

Страница 9: ...eet the requirements of your applications CAUTION Cables can be made by yourself or purchased from qualified providers It is recommended to purchase finished power wire products according to the termi...

Страница 10: ...ttery in the following way Step 1 Use an M6 screw to fasten the grounding wire to grounding terminal and fix the other end to the inverter directly Note that the cross section of grounding wire is 16m...

Страница 11: ...to one pair of the terminals of the battery 2 Put back the plastic cover 3 Fix the other ends to a breaker and then connect to the inverter CAUTION When connecting a power wire ensure that its OT term...

Страница 12: ...If the voltage difference is greater than 1V charge the battery with lower voltage 3 Power off the batteries Step 2 Connect network cables 1 Insert one end of network cable A into the PCS port of Bat...

Страница 13: ...ery 1 Battery 2 Battery 4 Inverter Battery 3 Step 3 Connect grounding wires Connect the grounding terminal of each battery to the grounding bar Inverter Battery 1 Battery 2 Battery 4 Battery 3 Groundi...

Страница 14: ...12 Step 4 Connect power wires Connect the terminals of each battery to the of the junction box respectively and then connect the junction box to the inverter Inverter Grounding bar Junction box...

Страница 15: ...wer off the battery Proceed again only after causes are confirmed 7 1 Power on Battery Power on the battery in either of the following ways Keep the inverter on and turn on battery breaker s The batte...

Страница 16: ...EW ENERGY CO LTD SHENZHEN GROWATT NEW ENERGY CO LTD T 86 0755 2747 1942 E service ginverter com W www ginverter com Address 2nd 3rd Floor Building 4 Jiayu Industrial Zone Xibianling Shangwu Village Sh...

Отзывы: