5. COMMISSIONING
5.1. Unlocking the boiler
!
WARNING:
During commissioning, the unlocking of the boiler can only be achieved
if the hydraulic system is compliant with the recommendations
mentioned in the hydraulic diagrams (see section 8.3, page 54). The
person in charge of this operation must ensure such compliance.
Unlocking the temperature:
Modify parameter 2212 from 70° C to the desired value (Maximum 85°C).
Unlocking the power:
Increase the value of parameter 9529 up to the value of parameter 9530
(corresponding with the nominal power of the boiler).
!
WARNING:
Adjusting the boiler to operate using propane results in the
modi
fi
cation of parameter 9529; the boiler power locking function is
therefore no longer active.
MODELS
Parameter 9529 value
120
140
180
225
275
320
390
450
power locked
4610
5300
3180
3870
3360
3930
3440
3900
power unlocked
6490
7460
4410
5400
4620
5450
4810
5480
5.2. Pre-commissioning
checks
For a cascade installation, check the hydraulic balance of the boilers.
Check that pressure when cold is at least 1 bar.
If this is a boiler room renovation, ensure that
fl
ushing and if necessary
silt removal from the installation have been correctly done (see
paragraph 1.5, page 7 of these instructions).
Check the
fl
ue-gas connections depending on the type of chimney (refer to
paragraph 4.9, page 24).
Check that the gas pressure and type are suitable for the products.
!
DANGER:
It is forbidden to use water containing glycol.
!
WARNING:
If connecting CHIMNEY B23 or B23P, it is COMPULSORY to
fi
t the air
fi
lter supplied with the boiler.