Toughsat
Flyaway Bracketing Manual
Ground Control
Step 4 – Place one of the rails on the ground and slide the two T-nuts into place on the two black marks.
Step 5 – Place the other rails together as shown. Line up the top rails so that ends are above the T-nuts.
Step 6 - From the hardware pouch, find four 9/16 bolts (with washers) that will secure the rails to each other.
- 4 -