End Rail And Center Support Rail Assembly

2

Side Rail Assembly

NOTE: Garden bed will be assembled upside down and 

fl

 ipped over 

when completed.

Stand two 4” x 4” x 19” corner posts (Item 1) and one 4” x 4” x 19” center 
post (Item 2) between the corner posts with slots facing each post and 
slots facing away from you.

Install two 45” x 5-1/2” side rails w/Logo (Item 4), (position side rails w/
Logo upside down) into the slots and slide to the bottom of the slots.

Repeat procedure for the remaining two 4” x 4” x 19” corner posts and 
the 4” x 4” x 19” center post, using 45” x 5-1/2” side rails (Item 3).

Install the three 31” x 5-1/2” side rails (Item 5) into the slots and slide to 
the bottom of the slots.

1

Position Logo Upside Down

2

4

1

4

5

5

5

5

Garden Bed Completed

4

Final Side Rail Assembly

Install the eight remaining 45” x 5-1/2” side rails (Item 3) into the slots 
and slide down.

Install the four remaining 31” x 5-1/2” side rails (Item 5) into the slots and 
slide down.

Flip the garden bed right side up. (See step 5).

Garden bed shown in 

fi

 nished position.

When 

fi

 lling with soil, raise the center support rail (Item 5) 

to the middle of the slots (as shown).

NOTE: Ground preparation is optional. It is recommended to level an 
area under the frame of the garden bed before placing garden bed and 

fi

 lling with soil.

Soil Capacity: 28.1 Cubic Feet