3
GB
Connecting to the power supply
Figures a/b:
A Transformer
B Extension cable
C Infra-red electronics
Connect power supply line 2 x 1.5mm
2
(electrician)
Electrical installation work must only be performed by a qualified electrician.
This work must be performed in accordance with regulations IEC 364-7-701-1984 (corresponds
to VDE 0100 Part 701) as well as all national and local regulations.
Install the protective tube (~28mm) for the extension cable between the transformer
and infra-red electronics
The extension cable between transformer and infra-red electronics must be routed through the protective
tube.
Technical Data
Supply voltage
230 V AC, 50/60 Hz
Power consumption
18.7 VA
Reception range
70cm in front of the wall (adjustable with remote control)
Flow volume
-Pre-flush
0 l/ 2 l, factory setting 0 l (adjustable with remote control)
-Flush cycle
2-6/9 l, adjustable, factory setting: full flow volume
Intermediate flushing
every 60 min (3 x) can be switched off with remote control
72 hour flushing
can be switched off with remote control
Minimum delay time
factory setting 7 s (adjustable with remote control)
Connection lines
Transformer - IR electronics:
extension cable (max. 25m)
Software class
A
Type of protection
IP 59K
Special accessory (Infra-red remote control 36206)
1.) Setting the range of reception
2.) Setting the flush duration
3.) Actuating lifting magnet
4.) Block lifting magnet (permanent stop)
5.) Resetting the basic setting
6.) Test mode
7.) 72-hour flush (factory setting: On)
Press and hold down the RESET button,
then also press the OFF AUTO button within 2 s
On = 4 short flashes/ Off = 2 long flashes
8.) Pre-flush (factory setting: Off)
Press the TEST button, press the ON AUTO button
On = 4 short flashes/ Off = 2 long flashes
9.) Intermediate flushing (factory setting: On)
Press the TEST button, press the OFF AUTO button
On = 4 short flashes/ Off = 2 long flashes
10.) Adjustment of the minimum delay time (factory setting: 7 s)
Press the TEST button, press the +/- button
4 short flashes = adjusted by one increment (approx. 1 s)
2 long flashes = final setting reached
Quit by pressing the TEST button or after 60 s
Approval and conformity
This product conforms to the requirements
of the relevant EU guidelines
The conformity declarations can be obtained from the following address:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
D-32457 Porta Westfalica
b94530031.book Seite 3 Montag, 5. Juli 2004 7:38 19
Содержание Tectron 38 394
Страница 2: ...II I a b 38 394 38 395 ...
Страница 26: ...23 UAE b94530031 book Seite 23 Montag 5 Juli 2004 7 38 19 ...
Страница 27: ...24 b94530031 book Seite 24 Montag 5 Juli 2004 7 38 19 ...
Страница 54: ...VI VII 39 38 19 20 21 22 23 24 25 26 27 28 30 31 29 32 ...
Страница 55: ...V 12 18 a b 17 18 13 14 15 12 17 16 17 ...
Страница 56: ...A5_adresse fm Seite 1 Montag 5 Juli 2004 2 42 14 ...