3
GB
Applications
Fitting for use with concealed fitting body 36 076 in conjunction
with function unit 36 067.
Technical Data
• Flow rate at 3 bar flow pressure:
Drench shower head
approx. 20 l/min
Head shower
approx. 12 l/min
Hand shower
approx. 12 l/min
• Automatic safety shut-off
(factory setting):
30 min
• Safety stop (factory setting):
39 °C
• Type of protection:
- Fitting
IP 54
- Operating panel
IP 57
Electrical test data
• Software class:
B
• Contamination class:
2
• Rated surge voltage:
2500 V
• Temperature for ball impact test:
100 °C
The test for electromagnetic compatibility (interference
emission test) was performed at the rated voltage and
rated current.
Note:
GROHE fittings with showers are equipped with non-return
valves.
Approval and conformity
The conformity declarations can be obtained from the following
address:
GROHE Deutschland Vertriebs GmbH
Zur Porta 9
D-32457 Porta Westfalica
Installation
Refer to the dimensional drawing on fold-out page I.
I. Fitting
,
see fold-out page II, Figs. [1] to [9].
1. Cut fitting template (A), see Fig. [1].
2. Unscrew sleeve (B) and remove plug (C), see Fig. [2].
3. Loosen set screw (D1) and remove pre-mounted union
nut (D), see Fig. [3].
4. Push pressure ring (E) with O-ring (E1) into the concealed
fitting body, see Fig. [4].
Note position of seal (E2), see detail.
5. Tighten union nut (D) by hand.
6. Position drilling template (F), align using a spirit level and
drill the holes, see Fig. [5].
7. Insert plugs (G1) and screw in hanger bolt (G) using the
tool provided, see Fig. [6].
Note dimension!
8. Remove plug (H) and attach connector (I) of the function
unit to connector (J) of the fitting, see Fig. [7].
9. Push fitting with seal (K) onto hanger bolt (G).
10. Insert connection nipple (L) into concealed fitting body
and push fitting into union nut (D).
11. Fasten bracket (M) using enclosed washers (M1) and
nuts (M2) and push on escutcheon (N), see Fig. [8].
12. Fasten set screws (D1) of union nut (D) and push on
escutcheon (O), see Fig. [9].
II. Hand shower
,
see fold-out page II, Fig. [10].
1. Connect shower hose (P) to the shower outlet.
2. Connect hand shower (R).
III. Operating panel
,
see fold-out page II, Figs. [11] and [12].
1. Attach connector (S) of the fitting to connector (T1) of
operating panel (T) and push back into the adapter (U)
of the fitting, see Fig. [11].
2. Insert operating panel (T) into adapter (U) and fasten using
set screws (V), see Fig. [12].
3. Fit cap (U1).
Open hot and cold water supply and check that
connections are watertight.
Operation
Using the operating panel
The actual value is synchronised with the display at 38 °C.
See
Calibrate
in the section Setting mode.
Programme buttons
This product conforms to the requirements of the
relevant EU guidelines.
Start/Stop button
Operational readiness of fitting. Water flow
commences following actuation of a programme
button. Repeated actuation stops water flow.
The connected outlets can be operated
simultaneously.
Pause button
Interrupts the flow of water (temperature arrow on
operating panel orange). The flow is resumed by
pressing the button again.
The fitting switches off automatically after a preset
time in pause mode (factory setting 60 s).
Temperature
Increases (red arrow, left) or decreases (blue arrow,
right) the water temperature.
The display flashes until the preset temperature
is reached.
Volume
Increases or decreases the flow rate in a total
of eight stages.
Temperature safety button
Overriding the safety stop (factory setting: 39 °C).
Drench shower head
Head shower
Side shower
Hand shower