INSTALLATION INSTRUCTIONS
FOR GROEN CASTER KITS

Part No. 150528, Rev. A 

IMPORTANT INFORMATION 

I

 KEEP FOR OPERATOR 

I

 IMPORTANT INFORMATION

Eclipse Braising Pans (Models BPM or BPP – G or E)
 
Steamers (Models VRC, SSB or HY)
 
Combo Ovens (Models CC-10 or C/2 – G or E)
 
TS-9 Stands (for table top units - Kettle Models TDB, TDH,
Braising Pan Model TD/FPC or Cooker Mixer TDB; TA/2)

OPERATORS AND INSTALLING TECHNICIANS

SHOULD READ, UNDERSTAND AND FOLLOW

WARNINGS AND INSTRUCTIONS IN THIS MANUAL

Содержание HY-3E

Страница 1: ...N Eclipse Braising Pans Models BPM or BPP G or E Steamers Models VRC SSB or HY Combo Ovens Models CC 10 or C 2 G or E TS 9 Stands for table top units Kettle Models TDB TDH Braising Pan Model TD FPC or Cooker Mixer TDB TA 2 OPERATORS AND INSTALLING TECHNICIANS SHOULD READ UNDERSTAND AND FOLLOW WARNINGS AND INSTRUCTIONS IN THIS MANUAL ...

Страница 2: ...ts Kettle Models TDB TDH 9 Braising Pan Model TD FPC or Cooker Mixer TDB TA 2 This Restraining Device Must Always Be Connected When the Appliance with Casters is in Service Disconnect Then Reconnect Only For Maintenance This restraining device is required for all units with casters or per one of the following standards 1 UL ANSI 197 2 ANSI Z83 11 CSA 1 8 GROEN CASTER KIT 1 ...

Страница 3: ...TRIC BRAISING PAN LENGTH OF FLEXIBLE CONDUIT MUST BE LONGER THAN THE RESTRAINING CABLE INSTALLATION PROCEDURE 1 Raise the braising pan about 8 above the ground 2 Unscrew and remove the factory installed bullet feet 3 Screw in casters into place 4 Level the braising pan front to back and left to right by adjusting the casters accordingly Figure 1 5 Anchor the restraining cable bracket to a secure s...

Страница 4: ...restraining cable to hole in braising pan frame as shown in figure 3 Figure 3 Figure 4 8 Completed assembly should look as shown in Figure 4 9 After installation pull out the braising pan to fully stretch the cable and verify that the gas hose or electrical conduit are not under tension or stretched 3 ...

Страница 5: ...T BE LONGER THAN THE RESTRAINING CABLE INSTALLATION PROCEDURE 1 Raise the steamer stand about 8 above the ground WARNING Support the steamer securely before lifting so that it does not tilt 2 Remove the factory installed bullet feet 3 Insert casters into place 4 Level the steamer front to back and left to right by adjusting the casters accordingly Figure 5 5 Drill a 13 32 0 406 or 9 mm diameter ho...

Страница 6: ...gure 6 Figure 7 GROEN CASTER KIT 7 Anchor the restraining cable bracket to a secure structure One of the preferred locations is on the concrete floor using anchor bolts not provided as shown in Figure 7 5 ...

Страница 7: ... must be adjacent to the eye bolt Figure 10 9 Install clasp of restraining cable to hole in restraining cable bracket and eye bolt Figure 7 and 10 10 After installation pull out the steamer to fully stretch the cable and verify that the gas hose or electrical conduit are not under tension or stretched GROEN CASTER KIT 6 ...

Страница 8: ...TALLATION PROCEDURE 1 Raise the combo oven stand about 8 above the ground WARNING Support the combination oven securely before lifting so that it does not tilt 2 Remove the factory installed bullet feet 3 Insert casters into place 4 Level the combo oven front to back and left to right by adjusting the casters accordingly Figure 11 Figure 12 5 Drill a 13 32 0 406 or 9 mm diameter hole through one o...

Страница 9: ...label Groen Part 084286 to the steamer side panel as shown in Figure 12 NOTE This label must be adjacent to the eye bolt 9 Install clasp of restraining cable to hole in restraining cable bracket and eye bolt 10 After installation pull out the combination oven to fully stretch the cable and verify that the gas hose or electrical conduit are not under tension or stretched GROEN CASTER KIT 8 ...

Страница 10: ...TRIC KETTLE LENGTH OF FLEXIBLE CONDUIT MUST BE LONGER THAN THE RESTRAINING CABLE INSTALLATION PROCEDURE Figure 14 Figure 15 1 Drill a 13 32 0 406 or 9 mm diameter hole through one of the rear legs of table 6 below the top of table as shown in Figures 14 and 15 above 2 Attach eyebolt washers lockwasher and nut to the table as shown in Figure 14 Figure 16 3 Anchor the restraining cable bracket to a ...

Страница 11: ...gure 17 Figure 18 5 Install clasp of restraining cable to hole in restraining cable bracket and eye bolt Figures 16 and 18 6 After installation pull out the TS 9 stand to fully stretch the cable and verify that the gas hose or electrical conduit are not under tension or stretched GROEN CASTER KIT 10 ...

Страница 12: ...1055 Mendell Davis Drive Jackson MS 39272 Telephone 601 372 3903 Fax 601 373 9587 www groen com INSTALLATION INSTRUCTIONS FOR GROEN CASTER KITS Part No 150528 Rev A ...