The Braising Pan should be installed in a 
ventilated room for efficient performance. Items 
which might obstruct or restrict the flow of air for 
combustion and ventilation must be removed. 
The area directly around the braising pan must 
be cleared of all combustible material. 
 

WARNING 

INSTALLATION OF THE BRAISING PAN 
MUST BE DONE BY PERSONNEL 
QUALIFIED TO WORK WITH GAS AND 
ELECTRICITY.  IMPROPER INSTALLATIN 
CAN RESULT IN INJURY TO PERSONNEL 
AND/OR DAMAGE TO EQUIPMENT. 

 

1.  Installation on combustible floors is     
       allowed, with a minimum clearance to                
       combustible and noncombustible  
       construction of six inches at the rear,  

and zero inches at the sides. will be 
attached, following the accompanying 
instructions regarding anchoring and 
location. 

 

 

b.  Stub in the electrical service and 

service and gas supply line so that 
they will be aligned with the control 
console on the left side of the pan 
once the pan is mounted. 

c. Mount the pan on the protruding studs 

of the chair carrier. 

Make

 

sure

 the 

bottom of the pan body is level, 
before you proceed to the next step. 
To prevent sanitation problems, seal 
the junction between pan and the wall 
with an NSF-approved material such 
as "Silastic" 

5.  Complete the piping to the gas service     

   by using % inch IPS pipe or approved  
   equivalent. 

 

Install the unit under a vent hood. 

 3.    For Open Leg Models (HFP/1, HFP/1E, 

HFP/2, HFP/2E): 

Level the unit by adjusting the bullet 
feet or floor flanges on the legs. Be sure 
the tilting mechanism has been turned 
all the way to the horizontal position. 
Check levelness with a spirit level set 
on the bottom of the pan body. Anchor 
the rear legs securely to the floor if floor 
flanges are ordered or required. 

 4.    Wall-Mounted Models (MW/HFP/1, 

MW/HFP/1E, MW/HFP/2, MW/HFP/2E 

a.  Install the provided "chair carrier"   
      frame in the wall to which the pan 

6.  For a unit on casters, complete                   

          connection to the gas supply with  
          connectors that comply with the  
          standard for Connectors for Moveable  
          Gas Appliances, ANSI Z21,69a-latest  
          edition. Restrain movement of the unit  
          by attaching a cable or chain to the  
          eyelet (provided at the back of the  
          frame) and anchoring the cable or chain 
          to the wall or floor. Make the length and  
          location of the cable such that the unit  
         cannot pull on the gas connection while  
         the cable is connected. 

7. The gas connection must be made with a 

quick disconnect device compliant with 
ANSI Z21.41b - latest edition. 

 Typical Multi-Unit Chair Carrier 

WARNING: 

THIS UNIT IS FOR COMMERCIAL USE.  
NEVER USE HOME OR RESIDENTIAL 
GRADE GAS CONNECTIONS.  THEY DO  
NOT MEET GAS CODES AND COULD BE 
HAZARDOUS. 

2. 

Содержание HFP/1

Страница 1: ...FOLLOW THE INSTRUCTIONS AND WARNINGS CONTAINED IN THIS MANUAL OPERATOR MANUAL Part Number 121023 MODELS HFP 1 HFP 1E MW HFP 1 MW HFP 1E HFP 2 HFP 2E MW HFP 2 MW HFP 2E Braising Pans Stainless Steel Ma...

Страница 2: ...OURING NOT DIRECTLY IN POUR PATH OF HOT CONTENTS 4 RETURN PAN BODY TO LEVEL POSITION AFTER CONTAINER IS FILLED OR TRANSFER IS COMPLETE 5 DO NOT OVER FILL CONTAINER AVOID DIRECT SKIN CONTACT WITH HOT C...

Страница 3: ...READ FIRST 2 EQUIPMENT DESCRIPTION 4 INSPECTION AND UNPACKING 6 INSTALLATION 7 INITIAL START UP 8 OPERATION 9 SEQUENCE OF OPERATION 11 CLEANING 12 MAINTENANCE 14 REFERENCES 14 TROUBLESHOOTING 15 PARTS...

Страница 4: ...ances the cover to keep it in either the opened or closed position The cover opens to the back and is hinged to the frame so it moves independently of the pan body The basic models differ in their mou...

Страница 5: ...HFP 2E 4 144 000 BTU hr MW HFP 1 2 MW HFP 1E 2 62 000 BTU hr MW HFP 2 2 MW HFP 2E 2 80 000 BTU hr MW HFP 11 3 MW HFP 1E 3 90 000 BTU hr MW HFP 2 3 MW HFP 2E 3 104 000 BTU hr MW HFP 1 4 MW HFP 1E 4 120...

Страница 6: ...te down the model number serial number and installation date of your unit and keep this information for future reference Space for these entries is provided at the top of the Service Log in this manua...

Страница 7: ...Silastic 5 Complete the piping to the gas service by using inch IPS pipe or approved equivalent Install the unit under a vent hood 3 For Open Leg Models HFP 1 HFP 1E HFP 2 HFP 2E Level the unit by adj...

Страница 8: ...e used Do not use flame to check for leaks 12 The appliance and its individual shutoff valve must be protected from the gas supply piping system during any pressure testing of that system at test pres...

Страница 9: ...nder the pan on the gas line to the burner manifold This valve selects settings of OFF PILOT or ON for the Combination Control 4 Mechanical 0 60 minute bell timer B Operating Procedure HFP 2 WITH THER...

Страница 10: ...ed as instructed at To Start Pan above 2 For Models with Hot Surface Ignition a To Start Pan 1 DO NOT attempt to light the burner with a flame 2 Turn on the electrical service to the unit 3 Turn the m...

Страница 11: ...t an item set the dial at 210 F or lower Put the cover down to minimize moisture loss or leave it up to help dry or reduce the product Set the thermostat higher to cook or drive off moisture faster Yo...

Страница 12: ...n the pan reaches the set temperature the thermostat switch opens stopping the signal to the gas control valve and causing the valve to close OM HFP When the pan cools below the set temperature the th...

Страница 13: ...will be sprayed unplug the unit from the electric power source or shut off the power at the circuit breaker or fuse panel 2 Clean all food contact surfaces soon after use before the pan has cooled com...

Страница 14: ...because scratches make the pan hard to clean and provide places for bacteria to grow Do NOT use steel wool which may leave particles imbedded in the pan surface and cause eventual corrosion and pittin...

Страница 15: ...uipment enter the date on which the work was done what was done and who did it Keep the manual with the equipment for quick and easy reference References American National Standards Institute 1403 Bro...

Страница 16: ...hat the main gas supply valve is open handle is in line with the gas pipe b Gas supply to the building c That the pan body is horizontal Burners will not light Auth Service Rep Only d Thermostat opera...

Страница 17: ...e operator clean and secure X c Are open and closed circuit output voltages of the generator in the acceptable range shown by the charts in the manual for the W720 Systems Tester X d Resistance of the...

Страница 18: ...e pins If 115V is present replace the igniter If 115V is not present replace the control module X f Voltage across the terminals of the main gas valve solenoid If 24 VAC is present replace the gas val...

Страница 19: ...OM HFP Parts List HFP 1 HFP 1E Models 18...

Страница 20: ...sembly HFP 1 2 014030 11 Shaft 3 4x15 003123 37 Cover Size 3 048819 12 Handwheel and Handle Assembly 012061 38 Cover Size 4 048818 13 Handwheel and Shaft 003130 39 Valve Gas Control Natural Gas 002648...

Страница 21: ...OM HFP Parts List HFP 2 HFP 2E Models...

Страница 22: ...ht 012100 43 Thermostat 100 F to 450 F 041700 14 Nut Hex 3 8 16 003566 44 Sensing Probe 003328 15 Swivel Joint 076680 45 Transformer 120 24V before 5 91 074839 16 Trunnion Race Casting 013488 Transfor...

Страница 23: ...658 New Serial Plate 1 065658 065658 NOTE Above parts for spark are for units with separate ignition box If unit is older it will have the valve and ignition boxes together If this is the case replace...

Страница 24: ...OM HFP Diagrams and Schematics Thermopile Ignition System HFP 2 Models Wiring Diagram HFP 1 Models 23...

Страница 25: ...OM HFP Electronic Coil Ignition System HFP 2E Models Before May 1991 Electronic Coil Ignition System HFP 2E Models After April 1991 24...

Страница 26: ...OM HFP Standing Pilot Ignition System HFP 2 Models Only RAM H 4 Ignition Module 24 V Igniter 25...

Страница 27: ...____________ Serial No ____________________ Location ____________________ Date Purchased ________________ Date Installed __________________ Purchase Order No _______________ For Service Call _________...

Страница 28: ...portation costs time mileage for the first twelve 12 months from date of installation or fifteen 15 months from date of shipment from Groen IV This warranty does not cover boiler maintenance calibrati...

Отзывы: