Groen HFP/1 Скачать руководство пользователя страница 2

OM-HFP 

 

CAUTION:    SHIPPING STRAPS ARE UNDER TENSION AND CAN SNAP BACK WHEN CUT. 

CAUTION:    UNIT WEIGHS 370 TO 560 LB. (165 TO 255 KG). FOR SAFE HANDLING, INSTALLER 

SHOULD OBTAIN HELP AS NEEDED, OR EMPLOY APPROPRIATE MATERIALS HANDLING EQUIPMENT 
(SUCH AS  A FORKLIFT, DOLLY, OR PALLET JACKET) TO REMOVE THE UNIT FROM THE SKID AND MOVE 
IT TO THE PLACE OF INSTALLATION. 

WARNING:    INSTALLATION OF THE BRAISING PAN MUST BE DONE BY PERSONNEL QUALIFIED TO WORK WITH 

GAS AND ELECTRICITY. IMPROPER INSTALLATION CAN RESULT IN INJURY TO PERSONNEL AND/OR 
DAMAGE TO EQUIPMENT. 

WARNING:    THIS UNIT IS DESIGNED FOR COMMERCIAL USE. NEVER USE HOME OR RESIDENTIAL GRADE GAS 

CONNECTIONS. THEY DO NOT MEET GAS CODES AND COULD BE HAZARDOUS. 

DANGER:    ELECTRICALLY GROUND THE UNIT AT THE TERMINAL PROVIDED. FAILURE TO GROUND UNIT COULD 

RESULT IN ELECTROCUTION AND DEATH. 

WARNING:   KEEP THE APPLIANCE AREA FREE AND CLEAR OF COMBUSTIBLE MATERIALS. 

CAUTION:    BE SURE ALL OPERATORS READ, UNDERSTAND AND FOLLOW THE OPERATING 
                      INSTRUCTIONS, CAUTIONS AND SAFETY INSTRUCTIONS CONTAINED IN THIS MANUAL. 

CAUTION:    KEEP FLOORS IN BRAISING PAN WORK AREA CLEAN AND DRY. IF SPILLS OCCUR, CLEAN              

                      IMMEDIATELY TO AVOID THE DANGER OF SLIPS OR FALLS. 

WARNING:    WHEN TILTING BRAISING PAN FOR PRODUCT TRANSFER: 

1)   USE CONTAINER DEEP ENOUGH TO CONTAIN AND MINIMIZE PRODUCT SPLASHING. 
2)   PLACE CONTAINER ON STABLE, FLAT SURFACE, AS CLOSE TO PAN AS POSSIBLE. 
3)   STAND TO SIDE OF PAN WHILE POURING - NOT DIRECTLY IN POUR PATH OF HOT CONTENTS. 
4)   RETURN PAN BODY TO LEVEL POSITION AFTER CONTAINER IS FILLED OR TRANSFER IS  

COMPLETE. 

5)   DO NOT OVER FILL CONTAINER. AVOID DIRECT SKIN CONTACT WITH HOT CONTAINER AND ITS 

CONTENTS. 

WARNING:  DO NOT HEAT AN EMPTY PAN FOR MORE THAN  5 MINUTES AT A SETTING HIGHER THAN 300°F. 

WARNING:   IF THE PAN CONTAINS ITEMS IN SAUCE OR MELTED FAT, THEY CAN SLIDE FORWARD SUDDENLY 

DURING TILTING AND CAUSE THE HOT LIQUID TO SPLASH OUT. 

WARNING:   AVOID ALL DIRECT CONTACT WITH HOT FOOD OR WATER IN THE PAN. DIRECT CONTACT 

COULD RESULT IN SEVERE BURNS. 

WARNING:   KEEP WATER AND SOLUTIONS OUT OF CONTROLS AND BURNERS. NEVER SPRAY OR HOSE THE 

CONTROL CONSOLE, OR ELECTRICAL CONNECTIONS. 

CAUTION:    MOST CLEANERS ARE HARMFUL TO THE SKIN, EYES, MUCOUS MEMBRANES AND 

CLOTHING. PRECAUTIONS SHOULD BE TAKEN TO WEAR RUBBER GLOVES, GOGGLES OR FACE 
SHIELD AND PROTECTIVE CLOTHING. CAREFULLY READ THE WARNINGS AND FOLLOW THE 
DIRECTIONS ON THE LABEL OF THE CLEANER TO BE USED. 

WARNING:   THE CONTROL BOX IS NOT WATERPROOF. TAKE CARE TO KEEP WATER AND 

CLEANING SOLUTIONS OUT OF THE BOX. NEVER HOSE OR SPRAY ELECTRICAL CONTROLS, 
CONNECTIONS OR CONTROL CONSOLE. 

WARNING:   BEFORE REPLACING ANY PARTS, DISCONNECT THE UNIT FROM THE ELECTRIC POWER SUPPLY AND 

CLOSE THE MAIN GAS COCK. ALLOW FIVE MINUTES FOR UNBURNED GAS TO VENT. 

CAUTION:    USE OF ANY REPLACEMENT PARTS OTHER THAN THOSE SUPPLIED BY GROEN OR 

AUTHORIZED DISTRIBUTORS CAN CAUSE INJURY TO THE OPERATOR AND DAMAGE TO THE 
EQUIPMENT AND WILL VOID ALL WARRANTIES. 

IMPORTANT: Service performed by other than factory authorized personnel will void all warranties. 

2

 

Содержание HFP/1

Страница 1: ...FOLLOW THE INSTRUCTIONS AND WARNINGS CONTAINED IN THIS MANUAL OPERATOR MANUAL Part Number 121023 MODELS HFP 1 HFP 1E MW HFP 1 MW HFP 1E HFP 2 HFP 2E MW HFP 2 MW HFP 2E Braising Pans Stainless Steel Ma...

Страница 2: ...OURING NOT DIRECTLY IN POUR PATH OF HOT CONTENTS 4 RETURN PAN BODY TO LEVEL POSITION AFTER CONTAINER IS FILLED OR TRANSFER IS COMPLETE 5 DO NOT OVER FILL CONTAINER AVOID DIRECT SKIN CONTACT WITH HOT C...

Страница 3: ...READ FIRST 2 EQUIPMENT DESCRIPTION 4 INSPECTION AND UNPACKING 6 INSTALLATION 7 INITIAL START UP 8 OPERATION 9 SEQUENCE OF OPERATION 11 CLEANING 12 MAINTENANCE 14 REFERENCES 14 TROUBLESHOOTING 15 PARTS...

Страница 4: ...ances the cover to keep it in either the opened or closed position The cover opens to the back and is hinged to the frame so it moves independently of the pan body The basic models differ in their mou...

Страница 5: ...HFP 2E 4 144 000 BTU hr MW HFP 1 2 MW HFP 1E 2 62 000 BTU hr MW HFP 2 2 MW HFP 2E 2 80 000 BTU hr MW HFP 11 3 MW HFP 1E 3 90 000 BTU hr MW HFP 2 3 MW HFP 2E 3 104 000 BTU hr MW HFP 1 4 MW HFP 1E 4 120...

Страница 6: ...te down the model number serial number and installation date of your unit and keep this information for future reference Space for these entries is provided at the top of the Service Log in this manua...

Страница 7: ...Silastic 5 Complete the piping to the gas service by using inch IPS pipe or approved equivalent Install the unit under a vent hood 3 For Open Leg Models HFP 1 HFP 1E HFP 2 HFP 2E Level the unit by adj...

Страница 8: ...e used Do not use flame to check for leaks 12 The appliance and its individual shutoff valve must be protected from the gas supply piping system during any pressure testing of that system at test pres...

Страница 9: ...nder the pan on the gas line to the burner manifold This valve selects settings of OFF PILOT or ON for the Combination Control 4 Mechanical 0 60 minute bell timer B Operating Procedure HFP 2 WITH THER...

Страница 10: ...ed as instructed at To Start Pan above 2 For Models with Hot Surface Ignition a To Start Pan 1 DO NOT attempt to light the burner with a flame 2 Turn on the electrical service to the unit 3 Turn the m...

Страница 11: ...t an item set the dial at 210 F or lower Put the cover down to minimize moisture loss or leave it up to help dry or reduce the product Set the thermostat higher to cook or drive off moisture faster Yo...

Страница 12: ...n the pan reaches the set temperature the thermostat switch opens stopping the signal to the gas control valve and causing the valve to close OM HFP When the pan cools below the set temperature the th...

Страница 13: ...will be sprayed unplug the unit from the electric power source or shut off the power at the circuit breaker or fuse panel 2 Clean all food contact surfaces soon after use before the pan has cooled com...

Страница 14: ...because scratches make the pan hard to clean and provide places for bacteria to grow Do NOT use steel wool which may leave particles imbedded in the pan surface and cause eventual corrosion and pittin...

Страница 15: ...uipment enter the date on which the work was done what was done and who did it Keep the manual with the equipment for quick and easy reference References American National Standards Institute 1403 Bro...

Страница 16: ...hat the main gas supply valve is open handle is in line with the gas pipe b Gas supply to the building c That the pan body is horizontal Burners will not light Auth Service Rep Only d Thermostat opera...

Страница 17: ...e operator clean and secure X c Are open and closed circuit output voltages of the generator in the acceptable range shown by the charts in the manual for the W720 Systems Tester X d Resistance of the...

Страница 18: ...e pins If 115V is present replace the igniter If 115V is not present replace the control module X f Voltage across the terminals of the main gas valve solenoid If 24 VAC is present replace the gas val...

Страница 19: ...OM HFP Parts List HFP 1 HFP 1E Models 18...

Страница 20: ...sembly HFP 1 2 014030 11 Shaft 3 4x15 003123 37 Cover Size 3 048819 12 Handwheel and Handle Assembly 012061 38 Cover Size 4 048818 13 Handwheel and Shaft 003130 39 Valve Gas Control Natural Gas 002648...

Страница 21: ...OM HFP Parts List HFP 2 HFP 2E Models...

Страница 22: ...ht 012100 43 Thermostat 100 F to 450 F 041700 14 Nut Hex 3 8 16 003566 44 Sensing Probe 003328 15 Swivel Joint 076680 45 Transformer 120 24V before 5 91 074839 16 Trunnion Race Casting 013488 Transfor...

Страница 23: ...658 New Serial Plate 1 065658 065658 NOTE Above parts for spark are for units with separate ignition box If unit is older it will have the valve and ignition boxes together If this is the case replace...

Страница 24: ...OM HFP Diagrams and Schematics Thermopile Ignition System HFP 2 Models Wiring Diagram HFP 1 Models 23...

Страница 25: ...OM HFP Electronic Coil Ignition System HFP 2E Models Before May 1991 Electronic Coil Ignition System HFP 2E Models After April 1991 24...

Страница 26: ...OM HFP Standing Pilot Ignition System HFP 2 Models Only RAM H 4 Ignition Module 24 V Igniter 25...

Страница 27: ...____________ Serial No ____________________ Location ____________________ Date Purchased ________________ Date Installed __________________ Purchase Order No _______________ For Service Call _________...

Страница 28: ...portation costs time mileage for the first twelve 12 months from date of installation or fifteen 15 months from date of shipment from Groen IV This warranty does not cover boiler maintenance calibrati...

Отзывы: