6 OM-DEE/4
The Groen Kettle is provided with complete internal wiring and is ready for immediate
connection. Wiring diagrams are provided in this manual and on the inside of the
control housing service panel. Any mechanical or electrical changes must be approved
by Groen’s Food Service Engineering Department.
The completed unit has been operated at the factory to test all controls and heater
elements.
A. Placement
1.
Set the kettle in place and level it by turning the bullet feet to adjust leg
length. Allow clearance around the unit for cleaning, maintenance and
service.
B.
Initial Checks
1.
Confirm that the jacket water level is above the mid point of sight glass.
If the level is low, follow the instructions under “Jacket Filling and Water
Treatment,” Page 14.
2.
The open end of the elbow on the outlet of the safety valve must face
downward. If it does not, turn it to the correct position.
C.
Providing Power
1.
Provide electrical power specified on the equipment electrical
information plate. Observe all local and national codes, and all
regulations in force at the time of installation.
2.
Bringing the electrical service through the entrance at the rear of the
support housing with one inch conduit, making a watertight connection
with the incoming lines. Observe all local and national codes, and all
regulations in force at the time of installation.
3.
Electrically earth the unit at the terminal provided.
Check the following to confirm that your DEE/4 kettle is properly installed:
•
Room for cleaning and servicing
•
The kettle is level
•
The correct amount of water is in the kettle jacket
•
Safety valve is pointed down
•
Unit is connected with a waterproof supply of the proper voltage, phase and
amperage rating
KETTLE CHARACTERISTICS
Unit
DEE/4-20
DEE/4-40
DEE/4-60
230 Volt - 1 Phase
57 Amperes
96 Amperes
96 Amperes
400 Volt - 3 Phase
57 Amperes
96 Amperes
96 Amperes
Installation
WARNING
INSTALLATION OF THE KETTLE MUST BE
DONE BY PERSONNEL QUALIFIED TO
WORK WITH ELECTRICITY. IMPROPER
INSTALLATION CAN RESULT IN INJURY
TO PERSONNEL AND/OR DAMAGE TO
EQUIPMENT.
CAUTION
ELECTRICALLY GROUND THE UNIT AT
THE TERMINAL PROVIDED. FAILURE TO
GROUND THE UNIT COULD RESULT IN
ELECTROCUTION AND DEATH.
Содержание DEE-CE Series
Страница 18: ...18 OM DEE 4 Parts List...
Страница 19: ...OM DEE 4 19 Parts List...
Страница 21: ...OM DEE 4 21 Wiring Diagram...
Страница 23: ......