Model G0827 (Mfd. Since 11/17)
-23-
Assembly
Your machine comes from the factory mostly
assembled. To complete assembly you must
install:
• X-Axis handwheel handle
• Y-Axis handwheel handle
• Z-Axis crank
• Coarse downfeed handles
• Fine downfeed handwheel handle
To assemble mill:
1. Install handwheel handles onto X-axis and
Y-axis handwheels (see
Figure 19).
2. Slide Z-axis crank onto square end
(see
Figure 20).
Figure 20. Location of square spindle.
Figure 19. Locations of X-axis and Y-axis
handwheels.
Y-Axis
Handwheel
X-Axis
Handwheel
3. Thread coarse downfeed handles into coarse
downfeed hub (see
Figure 21).
4. Remove fine downfeed handle from rear of
fine downfeed handwheel and thread into
front of handwheel (see
Figure 21).
Figure 21. Downfeed components assembled.
The machine must be fully assembled before it
can be operated. Before beginning the assembly
process, refer to
Needed for Setup and gather
all listed items. To ensure the assembly process
goes smoothly, first clean any parts that are cov-
ered or coated in heavy-duty rust preventative (if
applicable).
Fine
Downfeed
Handwheel
Handle
Coarse
Downfeed Handle
Square
End
Содержание G0827
Страница 92: ......