![Grizzly G0669X Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/grizzly/g0669x/g0669x_owners-manual_2266133020.webp)
-18-
g0669X precision 10" x 54" Vs Milling Machine
Assembly
tools Needed ............................................... Qty
snap ring pliers ................................................ 1
hex Wrench 4mm .............................................. 1
Wrench 14mm ................................................... 1
phillips screwdriver ........................................... 1
standard screwdriver ........................................ 1
to assemble the mill:
1. Move the head to an upright position (refer
to
Head Movement on Page 27 for detailed
instructions).
2. thread a handle onto the vertical crank and
use the 14mm wrench to fully tighten it.
3. Use the snap ring pliers to remove the retain-
ing ring from the vertical crank leadscrew (see
figure 12), slide the crank on the leadscrew,
then replace the retaining ring.
4. Use the vertical crank to raise the knee until
you can position the splash pan on the base,
then secure the pan in place with the two cap
screws, as shown in
figure 13.
figure 13. splash pan installed (left side
shown).
Cap screw
(1 of 2)
5. thread the remaining handles onto the three
ball handles and use the 14mm wrench to
fully tighten them (see
figure 14).
figure 12. Vertical crank installed.
retaining ring
handle
Crank
figure 14. handle installed on ball handle.
handle