background image

BASIC OPERATION 

– PM PID

 

REV E 

– 2/26/15 

 

Page 4 of 4 

Z:\Electrical\INSTRUCT\INSTRUMENT\WATLOW\PM\BASIC OPERATION - PM PID rev E.doc 

H. 

VIEW PID SETTINGS 

***NOT REQUIRED FOR NORMAL OPERATION 

1. 

From the 

HOME PAGE

, press and hold         and         for 3 seconds to 

enter the 

OPERATIONS

 

PAGE

.  

Ai 

is shown on the upper display and 

oPEr 

is shown on the lower display. 

2. 

Press         until 

LooP 

is shown on the upper display. Press         to enter 

LooP 

menu. 

3. 

Press         until 

h.Pb 

is shown on the lower display.  The setting shown on 

the upper display is your heat proportional band setting. 

4. 

Press         until 

ti 

is shown on the lower display.  The setting shown on 

the upper display is your heat integral setting. 

5. 

Press         until 

td 

is shown on the lower display.  The setting shown on 

the upper display is your heat derivative setting. 

6. 

Press  and hold        for two seconds to exit 

OPERATIONS 

page.   

 

 

 

 

 

 

 

 

Отзывы: