![Greyline PSL 5.0 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/greyline/psl-5-0/psl-5-0_user-manual_2264642014.webp)
Page 14
PSL 5.0 Pump Station Level Controller
Redundant 4-20mA input (pressure) Sensor Installation and Self-
Calibration
1. Install the redundant 4-20mA input sensor near the bottom of the well
according to manufacturer’s instructions and below the zero level.
2. Ensure that the PSL 5.0 with PZ sensor has been properly calibrated to
measure water level and is functioning properly.
3. Connect the 4-20mA redundant sensor to the PSL 5.0 SRC terminals when
the transmitter is loop-powered (24VDC power provided by the PSL 5.0) or
to SNK terminals when the 4-20mA transmitter is powered from another
source.
4. Operate the PSL 5.0 through several pump cycles to allow the 4-20mA input
sensor to self-calibrate. See note on previous page in regards to properly
configuring Min and Max Range for self-calibration to occur.
5. Note: When 4-20mA input sensor has completed self-calibration the Message
window will indicate that Sensor B status is Good.
Содержание PSL 5.0
Страница 2: ...Note This page has been left blank intentionally ...
Страница 45: ......