background image

 

Installation 

 

1.  The ceiling must can bear at least 120kgs weight, and the 

thickness of the ceiling must be 

30MM. 

2.  The cooker hood should be placed at a distance of 

65-75cm from the cooking surface for the best effect. See 

Pic 1. 

 

 

 

 

 

 

3.  Drill  1*170mm  round  hole  in  the  ceiling.  According  to  the 

hanging  board,  drill  9  holes  in  the  ceiling.  9pcs  of 

ST6*40mm  big  flat  screws  will  be  used  to  fix  the  hanging  board  on  the 

wood ceiling. (or drill 6 holes in the ceiling, 6pcs of 6mm*60mm explosion 

screws will be used to fix the hanging board on the cement ceiling). See 

pic.2 

 

 

 

 

 
 
 
 

A: The height of B+C+32cm+X 
B: The height of cabinet 
C: The height is 65-75cm 
X: The total height of angle iron 

Содержание EMF 990

Страница 1: ...Instruction Manual EMF 990...

Страница 2: ...CONTENT 1 Warning 2 Function and Feature 3 Installation 4 Maintenance 5 Exchange the lamp 6 Energy data sheet...

Страница 3: ...h your cooker hood please call the service department appointed by agent for servicing Please keep the room draughty when your cooker hood and gas hob are working Do not exhaust the gas from cooker ho...

Страница 4: ...ped with a large power low noise electric motor and centrifugal leaf it produces strong suction low noise non stick grease filter and easy to clean With the isolated low voltage circuit board control...

Страница 5: ...l 1 170mm round hole in the ceiling According to the hanging board drill 9 holes in the ceiling 9pcs of ST6 40mm big flat screws will be used to fix the hanging board on the wood ceiling or drill 6 ho...

Страница 6: ...ect wire box take apart the lamp s wire from the box then take out the small round body See pic 4 5 6 Take off the small round body you should be careful to install the glass See pic 6 7 After install...

Страница 7: ...lap length of angle iron not less 100MM See pic 10 10 Use 6pcs of M4 10mm big flat screws to fix the angle iron on the hood and install the extensible pipe See pic 11 12 11 Use the fixation board to p...

Страница 8: ...put the extensible pipe on the ceiling after that use 6pcs of M4 10mm big flat screws and M4 nut with gasket will be used to connect the angle iron to the hanging board 14 See pic 16 Drag the inner c...

Страница 9: ...c 17 Please strictly follow the guidelines below 1 Put the mesh into 40 50 clean water pour on detergent and soak for 2 3 mins Wear gloves and clean with a soft brush Please do not apply too much pres...

Страница 10: ...grease filter be careful to take off the grease filter screws in the anticlockwise by hand drag down and pick the grease filter out See pic 19 See pic 20 21 use screw driver to take off the shelter bo...

Страница 11: ...ood 78 9 Measured airflow rate at the best efficiency QBEP 375 0 m3 h Measured air pressure at best efficiency point PBEP 302 Pa Maximum airflow Qmax 636 5 m3 h Measured electric power input at best e...

Отзывы: