
FF
N
GP1230
GP1291
GP1211
GP1137
GP1230
GP1237
GP1230
GP1344
GP1227
GP1227
GP1248
MOTOR ASSEMBLY
13
Motor Pulley: The pulley, GP1137, should be slid
onto the motor shaft. Moving it in or out along with
adjustment of the axle pulley, GP1139 (see “REAR
AXLE ASSEMBLY LEFT” page), allows the two pulleys to
be aligned. If the motor pulley is a tight fit use a softer
material such as a piece of wood or rubber mallet to tap
it on.
Tightening: Once the motor and axle pulleys have been
aligned on the car the grub screw, GP1211, can be
tightened. A little thread lock on this screw will prevent
it coming undone.
Belt Tension: Correct drive belt tension is important to
aid a quick start and prevent excess belt wear. Loosen
the 4 bolts GP1237 and nuts GP1227, slide the motor
mounting plate, GP1344, towards the back of the car
to tension the belt then re-tighten the nuts & bolts.
If when starting to drive the car a graunching sounds
occurs then the belt is too loose. As a general guide a
correctly tensioned belt when twisted by hand should
rotate between 45° and 90°.
Содержание IET FORMULA GOBLIN G2
Страница 14: ...FF N GP1233 GP1230 GP1345 GP1233 GP1230 BATTERY TRAY ASSEMBLY 14...
Страница 17: ...GP1391 GP1362 GP1212 GP1347 GP1349 GP1350 GP1348 GP1351 SEAT ASSEMBLY 17...
Страница 18: ...F R O N T F R O N T GP1360 GP1215 GP1442 GP1360 FITTING SEAT 18...
Страница 22: ...GOBLIN G2 WIRING DIAGRAM 22...