Boom with Nose Unit
Use only straight 3" diameter rigid steel conduit or
Schedule 40 steel pipe for the boom tubes.
Do not use boom tubes longer than 3 meters (10').
Longer booms may bend or break.
Failure to observe this warning could result in severe
injury or death.
•
•
STRAIGHT EDGE
Set up the elbow unit as shown.
Improper setup will cause the elbow
unit to collapse.
Failure to observe this warning could
result in severe injury or death.
Use these boom tubes only:
boom tubes supplied with the Ultra Tugger
3" rigid steel conduit (3 meters or 10 feet
maximum)
3" Schedule 40 pipe (3 meters or 10 feet maximum)
1. Slide the boom tube into the boom mount until the
tube bottoms out. Sight the tube through the sight
hole to be sure the tube is fully inserted. Tighten the
set screw.
2. Slide the nose unit onto the tube until the tube
bottoms out. Sight the tube through the sight hole
to be sure the tube is fully inserted. Tighten the set
screw.
•
•
•
Setup—Mounting Components
Sight Hole