![GREEN SERIES FITNESS CIR-TM6000AC-G1 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/green-series-fitness/cir-tm6000ac-g1/cir-tm6000ac-g1_owners-manual_2261218017.webp)
©April 2017
Call Toll free at (800) 269-7130
CIR-TM6000AC-G1 Revision 1.2
16
John C. Jensen
UNPACKING & ASSEMBLY
Step 6
: Final Tightening of Mast to Frame
.
1. Using a Torque wrench set to
20 ft/lbs
, tighten (8) bolts. Verify that the console mast is secure and tight by
lifting up
and down vigorously on the handles with 50 to 100 pounds of force several times. If needed, re-torque to the
specifications outlined.
(2) bolts 20 ft/lbs
(2) bolts 20 ft/lbs
(2) bolts 20 ft/lbs
(1) bolt 20 ft/lbs
(1) bolt 20 ft/lbs