Three-Phase UPS (10kVA-160kVA) Series
User Manual
3 Installation
43
3.5 Install UPS
3.5.1 Single-unit
In this section, we take the ground installation as an example. For other installation way, please adjust
the installation procedure on the basis of actual condition.
For easy installation and maintenance, when the UPS is installed on the ground, it needs to reserve
the wire groove, as shown in Figure3-8.
Figure3-8
Wiring groove diagram
The wiring groove of Three-Phase (10kVA -160kVA) series UPS is the same. The recommended width
is 180mm and height is 200mm.
Step 1
Determine and plan the installation position according to the UPS size (as shown in Figure3-9,
Figure3-10 and Figure3-11) and installation clearance requirement (see
Clearance
).