GREEN BANK LB24150 Скачать руководство пользователя страница 4

04

05

LiFePO4 Battery System for Households

LiFePO4 Battery System for Households

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You 
should have received the following items inside of package.

3.1 Unpacking and Inspection

3.2 Mounting the Unit

Consider the following points before selecting where to install:
• Do not mount the battery on flammable construction  materials.
• The ambient temperature should be between 0°C and 45°C to ensure optimal operation.
• The recommended installation position is to be adhered to the wall vertically.
• Be sure to keep other objects and surfaces as shown in the right diagram to guarantee sufficient heat dissipation and 

to have enough space for removing wires.

Please follow below steps to implement battery connection:
1.Assemble battery ring terminal based on recommended battery cable and terminal size.
2.Connect all battery packs as units requires. It’s suggested to connect at least 2 sets of LB24V for 

inverter larger than 4KVA/5KVA model, and at least 2 sets of LB48V for inverter larger than 7.5KVA
in parallel connection

Note: if you need the battery wake-up when the grid back, connect the battery with grid use 
power adapter and communication line 1 shown in the package list.

3.3 Connection for Parallel Mode

The eStrong LB series battery support to be connected in parallel for expansion. If you need one more battery 
bank work in parallel mode, connect the battery as shown in PIC 2

Step 3

:

 The communication terminal (the other 

end) is connected as shown in Figure 3. Only 
one communication line (network cable) is 
required to connect through the hole between 
the two batteries. Another one is used as a backup.

Step 4

:

 

After all connections have been made, as 

shown in Figure 4, secure the gap between the two 
batteries with the accessories and secure the battery 
pack against the wall.

Note:

 After completing the above 4 steps, arbitrarily select the positive and negative poles of one of the battery packs to output 

(the upper battery pack or the lower battery pack, you can not select the positive and negative poles of the two battery packs 
at the same time). After confirming the correct connection of the inverter, controller and battery, you can turn on any of the 
switches and use the battery group happily.

3. INSTALLATION

LB24150

LB24250 

 

LB48200          LB48250

LB24200 

 

/

Step 1

:

 The ba eries are placed 

as shown in Figure 1

Step 2

:

 

Battery terminal connection As shown in 

Figure 2, the connection line between the two 
batteries is connected through the hole.

NO             NAME

SPECIFICATION

PICTURE

Battery connector           Used for battery connection

Hanging board

Fixing the top one battery at wall

Communication line 1     

Communication line 2     Used for Communication among batteries

Cables

  Used for battery parallel connection

Adapter

Screw 

       Mounting screw

PV Wake up line            

User manual

User manual

5

7

6

3

1

1

4

5

6

7

3

4

2

2

8

Grid activation communication wire 
( used with 6) 

Used for activating the pack when grid
power recover 

8

9

Used for auto restart when PV comeback 
in off-grid system

9

Отзывы: