51
for North America
Manometer
Gas valve
Liquid valve
LO knob
Connection hose
HI knob
Manometer
Vacuum pump
7.3.2 Refrigerant Adding
(1) Refrigerant quantity of outdoor unit before delivery:
Mode
GMV-36WL/B-T(U)
GMV-48WL/B-T(U)
Refrigerant Qty (kg/oz)
6.5(229)
6.5(229)
1) The refrigerant amount charged before delivery doesn’t include the amount that needs to be added to indoor units and the
connection pipeline.
2) Length of connection pipe is decided on site. Therefore the amount of additional refrigerant shall be decided on site according to
3) Record the amount of additional refrigerant for convenience of after-sales service.
(2) Calculation of the amount of additional refrigerant
Calculation method of the quantity of additional refrigerant (based on liquid pipe)
Quantity of additional refrigerant = ∑length of liquid pipe X q
uantity of additional refrigerant per meter
r
(39-3/8inch)
Diameter of liquid
pipe
(mm/inch)
Φ22.2(7/8
)
Φ19.05(3/4
)
Φ15.9(5/8
)
Φ12.7(1/2
)
Φ9.52(3/8
)
Φ6.35(1/4)
kg/m
0.35
0.25
0.17
0.
11
0.054
0.022
oz/inch
0.314
0.224
0.152
0.099
0.048
0.020
NOTICE!
Liquid pipe that is within 20m(65-5/8feet) doesn’t need to be added with refrigerant.
3) Calculation example
Ultra Heating GMV5 Multi VRF
Содержание ULTRA heating GMV-36WL/B-T
Страница 1: ...Ultra Heating GMV5 Multi VRF for North America R410A GC201603 1 ...
Страница 3: ...1 Ultra Heating GMV5 Multi VRF for North America PRODUCT PRODUCT ...
Страница 15: ...13 for North America CONTROL CONTROL Ultra Heating GMV5 Multi VRF ...
Страница 38: ...36 Ultra Heating GMV5 Multi VRF for North America INSTALLATION ...
Страница 66: ...64 for North America MAINTENANCE Ultra Heating GMV5 Multi VRF ...
Страница 71: ...69 for North America Ultra Heating GMV5 Multi VRF 3 Discharge temperature protection ...
Страница 95: ...JF00302969 ...