58
for North America
1)
Before test operation
The appearance of the unit and the refrigerant pipes cannot be damaged during the installation.
Do not switch on power before installation is finished completely.
Electrical wiring must be connected correctly and securely.
The stop valves of the outdoor unit should be opened fully.
All the impurities such as scraps and thrums must be cleared from the unit.
2)
Test operation method
①
The
test operation
should be carried out by the professionally skilled personnel on the premise that all items
listed above are in normal conditions.
②
Set the status of the power supply switch as “ON” eight hours before the start of operation
③
Press mode button, to select the COOL, or HEAT. Whether the air conditioner is work normally or not.
The fan motor of the indoor unit will run automatically in one minute.
The fan motor and compressor of the outdoor unit will run automatically in one minute.
④
Make sure that every combination of indoor units can work well.
Caution
!
If the unit cannot work nor has any abnormal noise after the compressor is started, turn off the unit for an
immediate check.
Photovoltaic Direct-driven
VRF
Содержание R410A
Страница 1: ...Photovoltaic Direct driven VRF for North America R410A GC201610 1 ...
Страница 3: ...1 Photovoltaic Direct driven VRF for North America PRODUCT PRODUCT ...
Страница 15: ...13 for North America CONTROL CONTROL Photovoltaic Direct driven VRF ...
Страница 38: ...36 Photovoltaic Direct driven VRF for North America INSTALLATION ...
Страница 61: ...MAINTENANCE for North America Photovoltaic Direct driven VRF 59 ...
Страница 65: ...63 for North America Photovoltaic Direct driven VRF 3 Discharge temperature protection ...
Страница 90: ...JF00303127 ...