193
Installation and Maintenance
Service Manual
7.Remove motor and motor support
8.Remove electric box assy
9.Remove clapboard sub-assy
Procedure
Steps
tor Pull out the lead-out wire and remove
themotor. Remove the 2 tapping screws
re-move it.
Remove the 2 screws fixing the cover of
elec-tric box. Lift to remove the cover. Loos-
en thewire and disconnect the terminal. Lift
to re-move the electric box assy.
Loosen the screws of the clapboard sub-
assy .The clapboard sub-assy has a hook
on thelower side. Lift and pull the clapboard
sub-assy to remove.
motor
motor support
electric box assy
clapboard sub-assy
Содержание GWC09AFC-D3DNA1A/O
Страница 1: ...Service Manual Change for life GREE ELECTRIC APPLIANCES INC OF ZHUHAI...
Страница 188: ...185 Installation and Maintenance Service Manual...
Страница 212: ...209 Installation and Maintenance Service Manual GWC24QE D3DNB2R O GWH24QE D3DNB2R O Note Take heat pump for example...
Страница 213: ...210 Installation and Maintenance Service Manual...
Страница 214: ...211 Installation and Maintenance Service Manual...
Страница 215: ...212 Installation and Maintenance Service Manual...
Страница 216: ...213 Installation and Maintenance Service Manual...
Страница 217: ...214 Installation and Maintenance Service Manual...