5HPRYDO3URFHGXUH
Steps
Procedure
screw
welding joint
screw
clasp
screw
screw
screw
9. Remove evaporator assy
evaporator assy
Unsolder the welding joint connected
with the pipeline, remove the 2 fixing
screws and then remove the
evaporator assy.
10. Remove electric box assy
electric box assy
Pull the clasp of electric box cover
outwards; remove the electric box
cover; remove the connection wire on
the PCB board; remove the 2 fixing
screws and then remove the electric
box assy.
electric box cover
capacitor box cover
11. Remove capacitor box sub-assy
capacitor box
sub-assy
Remove the 2 screws fixing the cover
of capacitor box, remove the
connection wire on the capacitor and
then remove the cover of capacitor box;
remove the 1 screw fixing the capacitor
box and then remove the capacitor box
sub-assy.
12. Remove supporting board 1, 2 and 3
supporting board 1
supporting
board 2
supporting board 3
Remove the 6 fixing screws to remove
the supporting board 1, 2 and 3.