Multi Variable Air Conditioners Duct Type Indoor Unit
12
please cut off power supply, disconnect power cord and then put on the electric box
cover.
(3) Check if the water drains smoothly from the drain pipe and check if there is water leakage on
the connection pipe.
(4) Arrange insulation of drain hose and pipe clamp after checking the drain system.
4.4 Installation of Air Duct
(1) There should be insulation layer on air-out duct, air-return duct and fresh air duct to avoid heat loss and moisture.
Adhere a nail on the air duct and then add thermal sponge with a layer of tin. Fasten it with a nail cover and then
seal the junction with tin tapes; You can also use other materials that have good insulation quality.
(2) Each air-out duct and air-return duct should be fixed on a pre-made board with iron frame. The junction of air duct
should be well-sealed in order to prevent air leakage.
(3) The design and construction of air duct should comply with national requirements.
(4) The edge of air-return duct is suggested to be more than 150mm (5-7/8 in.) away from the wall. Add a filter to the
air-return opening.
(5) Please consider noise-damping and vibration damping for the design and construction of air duct. Besides, noise
source must be away from people. For instance, do not have the air-return opening installed on top of the
user(offices, rest area, etc.).
4.4.1 Installation of Air-out Duct
(1) Installation of Rectangular Duct.
Fig 4.4.1.1
No.
Name
No.
Name
1
Hanger Rod
5
Static Pressure Box
2
Return Air Duct
6
Filter Screen
3
Canvas Duct
7
Main Supply Air Duct
4
Return Air Inlet
8
Supply Air Outlet
Содержание GMV-ND07PLS/B-T
Страница 23: ...Multi Variable Air Conditioners Duct Type Indoor Unit 19 Fig 5 5...
Страница 26: ......