Ducted Type Split Air-Conditioner Units(Inverter Series) 

14 

4.2 Test Operation and Debugging 

  NOTES! 

  After finishing the first installation or replacing the main board of outdoor unit, it is   

necessary to perform test operation and debugging. Otherwise, unit won’t be able to 
work. 

  Test operation and debugging must be performed by professional technicians  or 

under the guidance of professional technicians. 

4.2.1 Prepare The Test Operation and Debugging 

(1)  Do not connect power until all installation work is finished. 
(2)  All control circuits and wires are correctly and securely connected. 
(3)  Check whether the fixing loops for compressor foots are removed. 
(4)  All small pieces, especially metal chips, thread ends and forceps holder, must be 

removed from the unit. 

(5)  Check whether unit’s appearance and pipeline system has been damaged during 

transportation. 

(6)  Calculate the quantity of refrigerant that needs to be added according to the pipe length. 

Pre-charge the      refrigerant. In case that the required charging quantity is not reached 
while refrigerant can’t be added, record the quantity of refrigerant that still needs to add 
and  complement the quantity during test operation.  For details of adding refrigerant 
during test operation, see below. 

(7)  After refrigerant is added, make sure valves of outdoor unit are completely open. 
(8)  For the convenience of troubleshooting during debugging, unit shall be connected to a 

PC with applicable debugging software. Make sure unit’s real-time data can be checked 
through this computer. The installation and connection of debugging software can be 
found in the Service Manual. 

(9)  Before test operation, make sure unit is power on and compressor has been preheated 

for more than 8 hours. Touch the unit to check whether it’s normally preheated. If yes, 
start test operation. Otherwise, compressor might be damaged. 

(10) If the LED digital tube on main board displays,then input the startup password. For 

operation details, please see the instructions for the function of startup password.   

4.2.2 Test Operation and Debugging 

Once the unit is energized and turned on for the first time, the display tube of outdoor unit 

displays “A0”, which indicates debugging standby status. At this time, hold SW3 button 
successively for 5s on the main module to enter into the automatic debugging, and then the 
engineering debugging will perform according to the set procedures. Step3(conformation of 
outdoor unit’ quantity) and step4(conformation of indoor unit’ quantity) should be confirmed 
manually by pressing “SW3”, while other procedures will be performed automatically. Once the 

Содержание FGR50Pd/D2Na-M

Страница 1: ...Owner s Manual Original Instructions Commercial Air Conditioners Ducted Type Split Air Conditioner Units Inverter Series Models FGR50Pd D 2 Na M FGR60Pd D 2 Na M...

Страница 2: ...mage due to improper disassembly and inspection which may impact the normal operation of unit please do not disassemble the unit by yourself You can contact with the special maintenance center of our...

Страница 3: ...rer will bear no responsibilities when personal injury or property loss is caused by the following reasons 1 Damage the product due to improper use or misuse of the product 2 Alter change maintain or...

Страница 4: ...Outdoor Unit 8 3 1 Dimension of Outdoor Unit and Mounting Hole 9 3 2 Installation Space Requirement 9 3 3 Refrigerant Pipe Connection 9 3 4 Vacuum Pumping Refrigerant Adding 10 3 5 Electric Wiring 11...

Страница 5: ...place with special requirements such as kitchen or washing room Otherwise it will affect the normal operation or shorten the service life of the unit or even cause fire hazard or serious injury As fo...

Страница 6: ...terial fog dusk or moist 2 2 Outline Dimension and Installation Spots Equip with an inspection hatch after lifting the unit For the convenience of maintenance the service port should be on one side of...

Страница 7: ...y using a nut and washer from upper and lower sides of the hanger bracket The washer fixing plate will prevent the washer from falling 4 The usage of paper pattern Refer to paper pattern of installati...

Страница 8: ...e diameter of drainage pipe joint 3 Install drainage pipe according to the following fig and arrange insulation to the drainage pipe Improper installation may lead to water leakage and damp the furnit...

Страница 9: ...ould be determined by the pressure of the drain hose Drain hose is in negative pressure state A B P 10 20 mm Drain hose is in positive pressure state A 30mm B P 10 20 mm NOTE P is the absolute pressur...

Страница 10: ...nt air leakage The design and construction of air duct should comply with national requirements The edge of air return duct is suggested to be more than 150mm 5 7 8 inch away from the wall Add a filte...

Страница 11: ...wered by independent circuit and specific socket 4 The wiring should be in accordance with related regulations in order to ensure the units reliable running 5 Install circuit breaker for branch circui...

Страница 12: ...terminal H1 and H2 of indoor 4 bit wiring board 4 Fix the communication wire with wire clip on the electric box 5 Wiring instructions of remote receiving light board and wired controller Fig 15 2 6 3...

Страница 13: ...tallation space Unit mm Fig 17 3 3 Refrigerant Pipe Connection NOTES Do not loosen the cap of the pipes when connecting the pipes between the indoor unit and the outdoor unit Connecting the pipes as s...

Страница 14: ...he curving process should not be larger than 3 times in the same bending position During engineering installation the connection pipe inside the unit must be wrapped by insulation sleeve 3 4 Vacuum Pu...

Страница 15: ...ing codes 2 Use air conditioner specialized power supply and make sure that it is consistent with system s rated voltage 3 Do not pull the power cord with force 4 All electrical installation must be p...

Страница 16: ...wire to the following Water pipe Gas pipe Drain pipe Other places that are deemed as not secure by professional technicians 3 5 2 Wiring Diagram 1 Connection of power cord and communication wire Separ...

Страница 17: ...king condition changes please adjust the specification according to national standard 4 Check Items After Installation and Test Operation 4 1 Check Items After Installation Check items Possible condit...

Страница 18: ...ding refrigerant during test operation see below 7 After refrigerant is added make sure valves of outdoor unit are completely open 8 For the convenience of troubleshooting during debugging unit shall...

Страница 19: ...varies from different type DIP switch SAI DIP switch varies from different cooling capcity before leaving the factory DIP switch is set for different models and fixed with glue The main control functi...

Страница 20: ...over 5s to enter auto debugging 2 Exit project debugging After entering project debugging press SW3 button consecutively in the master module for over 5s to exit the debugging 3 Complete project debu...

Страница 21: ...for Code and Operating Method Progress LED Display code Display status Start A0 Always ON No debugged yeat Press SW3 button consecutively in the master module for over 5s to enter auto debugging 01_M...

Страница 22: ...l enter the next step 2s later 05_ Internal communication of outdoor unit 05 C2 Display repeatedly Communication error between master control and compressor drive Please check the connection between t...

Страница 23: ...mong different modules are correctly connected 09 oC Display repeatedly Confirmation of valve status All modules are halted normally nixie tubes of all modules will display once circularly 10_ Debuggi...

Страница 24: ...the filter NOTES If problem cannot be solved after checking the above items please contact Gree service center and describe the cases and models Following circumstances are not malfunctions Malfunctio...

Страница 25: ...scharge temperature protection of compressor 1 F Main board of ODU is poor Malfunction of high pressur e sensor Malfunction of low pressure sensor Malfunction of discharge temperature sensor of compre...

Страница 26: ...e shock No main IDU Power supply is insufficient 1 to more number of IDU is inconsistent 1 to more IDU series is inconsistent Alarm due to bad air quality Fresh air unit d Malfunction of exit tube tem...

Страница 27: ...pressur e protection P Drive current detection circuit malfunction of compressor Low voltage protection of compressor s drive DC bus bar Phase lacki ng of inverter compressor Drive charging circuit ma...

Страница 28: ...7 2 Drain Pipe Please check regularly whether drain pipe is blocked or not Make sure condensate can be drained out smoothly 7 3 Notice Before Seasonal Use 1 Check whether air inlets and air outlets o...

Страница 29: ...uct the tests 8 After Sales Service If there s quality defect or other problems in the product please contact Gree local after sales service department for help Warranty must be based on the following...

Страница 30: ......

Отзывы: