YP2425 and YP2425F
iii
2016-11-16
401-406M
©
Copyright 2006, 2007, 2008, 2009, 2010, 2011, 2012, 2014, 2015, 2016 All rights Reserved
Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed
for damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products
as it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.
Trademarks of Great Plains Manufacturing, Inc. include: AccuShot, Max-Chisel, Row-Pro,
Singulator Plus, Short Disk, Swath Command, Terra-Tine, Ultra-Chisel, and X-Press.
Registered Trademarks of Great Plains Manufacturing, Inc. include: Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone,
Nutri-Pro, Seed-Lok, Solid Stand, Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo-Max, Turbo-Till, Ultra-Till, Whirlfilter, and Yield-Pro.
Brand and Product Names that appear and are owned by others are trademarks of their respective owners.
Printed in the United States of America
Table of Contents
Important Safety Information.................................................1
Safety Decals ....................................................................6
Introduction...........................................................................12
Document Family .....................................................12
Description of Unit ...........................................................12
Intended Usage ........................................................12
Definitions.................................................................12
Preparation and Setup .........................................................14
Post-Delivery/Seasonal Setup.........................................14
Pre-Planting Setup ..........................................................14
Hitching Tractor to Planter...............................................15
If Weight Transfer is Installed...................................15
Hitching with 3-Point.................................................16
Hitching with Hydraulic Tongue (Option)..................16
Raising/Lowering Tongue.........................................17
Local Float on Hydraulic Tongue..............................17
Hydraulic Hose Hookup...................................................17
Protecting Fan Hydraulic Motor Seals......................19
Electrical Hookup.............................................................20
Store Main Parking Stand ........................................20
Storing 3-Point Parking Stands ................................21
Tank Cart Hitching....................................................21
Fertilizer Connection Types......................................21
Making Fertilizer Connections ..................................22
Heights and Leveling .......................................................22
Set Tongue Height ...................................................22
Checking Planter Leveling Side to Side ...................23
Center Section Level Check.....................................23
Wing Leveling ..................................................................24
Lock Up Fertilizer Drive ...................................................25
Operating Instructions .........................................................26
Pre-Start Checklist...........................................................26
Unfolding The YP24 ........................................................27
Raising/Lowering Planter.................................................29
Local Float on Hydraulic Tongue..............................29
Raising Planter .........................................................30
Lowering Planter ......................................................30
Folding the YP24 .............................................................31
Re-phasing Fold System ..........................................33
Transporting the Planter..................................................34
Field Set-Up Checklist.....................................................36
Field Operation................................................................38
Marker Unfolding .............................................................39
Monitor Operation............................................................40
Planting ...........................................................................41
Electric Clutch Operation.................................................42
Swath Command™ Clutch Operation .............................43
Weight Transfer Operation (Option) ................................43
Y-Tubes...........................................................................44
Airbox Operation .............................................................44
Fan Operation ..........................................................44
82 Bu. Hopper Operation ................................................45
Adding Seed to 82 bu. Hopper.................................45
Changing the Seed Box or 82 Bu. Hopper ......................46
Checking Planting Rate...................................................47
Auxiliary Hydraulics .........................................................48
Operating Auxiliary Hydraulics .................................48
Trailer Operations............................................................49
Short-Term Parking .........................................................50
Long-Term Storage .........................................................51
Adjustments..........................................................................52
Marker Disk Adjustment ...........................................54
Marker Extension .....................................................54
Marker Gauge Wheel Adjustment ............................55
Marker Shear Bolt Replacement ..............................55
Marker Chain Length Adjustment.............................55
Dual Marker Speed Adjustment ...............................56
Height Switch Adjustment ...............................................57
Height Switch Adjustment ...............................................58
Fan Adjustments .............................................................59
Liquid Fertilizer Setup......................................................60
Содержание YP2425
Страница 2: ...Table of Contents Index Table of Contents Index...
Страница 164: ...2016 11 16 Table of Contents Index 401 406M YP2425 and YP2425F Table of Contents Index 160...
Страница 165: ...Table of Contents Index Table of Contents Index...
Страница 166: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402...