2016-11-16
401-406M
YP2425 and YP2425F
Operating Instructions
38
Field Operation
First Pass Operation Checklist
Page
1.
Raise planter and line up at start of first
planting row
2.
Set tractor 3-point hitch to “depth control”
operation (and not load control)
-
3.
Unfold marker on next-row side.
4.
Set fan hydraulic circuit to low flow,
engage circuit. Gradually adjust hydraulic
flow to 3800 rpm.
5.
Engage drive via seed monitor. Refer to
seed monitor manual.
-
6.
If planter has a fertilizer system integrated
with the DICKEY-john seed monitor, set
the “Fert.Pump” switch on the Clutch
Folding Module to ON.
7.
In the CLUTCH cluster of the Clutch
Folding Module, set all switches, including
Master, to ON.
8.
Pull forward, lower planter, and begin
planting for a short distance.
9.
Stop. Assess:
•
planting depth
•
seed spacing
•
press wheel operation
•
fertilizer application (if in use)
10.
Make necessary adjustments
Sharp Field Turns Checklist
Page
1.
Fold marker
2.
Raise planter
3.
Make turn
4.
Lower planter
5.
Unfold marker on next-row side.
6.
Resume planting.
Suspending Planting Checklist
Page
1.
Stop tractor
2.
Fan hydraulic circuit to Float or Neutral
3.
Raise planter
4.
Fold Marker
Ending Planting Checklist
Page
1.
Suspend operations as above, then
2.
Install lift locks
3.
Lights ON
-
4.
Transport
Содержание YP2425
Страница 2: ...Table of Contents Index Table of Contents Index...
Страница 164: ...2016 11 16 Table of Contents Index 401 406M YP2425 and YP2425F Table of Contents Index 160...
Страница 165: ...Table of Contents Index Table of Contents Index...
Страница 166: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402...