![GREAT PLAINS Yield-Pro Air-Pro YP2425A Скачать руководство пользователя страница 160](http://html1.mh-extra.com/html/great-plains/yield-pro-air-pro-yp2425a/yield-pro-air-pro-yp2425a_operators-manual_2259528160.webp)
Great Plains
| 401-626M | 2019-06-11
156
YP2425A
Appendix B - Initial Setup
Weight Transfer Shipping Links
When a planter is on customer premises, and further
movements will only be done with a tractor or towing
vehicle having hydraulic motor return and case drain
remote ports, remove the weight transfer shipping links.
1. Use a hoist or a second worker to support the weight
of the outboard end of a weight transfer cylinder .
2. Remove both cotter pins and clevis pins:
805-396C PIN CLVS 1.0X3.13 USBL
from each end of a shipping link:
Remove the link.
3. Swing the cylinder down. Align the clevis with the
wing lug . Secure with one of the clevis pins and
cotters.
4. Store the other clevis pin and cotter in the clevis end
of the link. Store the link for future use.
5. Repeat step 1 through step 4 for the other wing.
To install a link, complete step 4 through step 1 in
reverse order.
See page 47 for initial weight transfer setup.
Figure 156
Weight Transfer Shipping Link
36422
858-295C
DO NOT MOVE PLANTER FOLDED
OR UNFOLDED WITHOUT CONNECTING
FAN CASE DRAIN AND LOW PRESSURE
RETURN TO THE TRACTOR OR
INSTALLING WEIGHT TRANSFER
SHIPPING LINKS. FAILURE TO DO
SO CAN RESULT IN DAMAGE TO
WEIGHT TRANSFER CIRCUIT.
NOTICE
1
2
Содержание Yield-Pro Air-Pro YP2425A
Страница 172: ...Table of Contents Index Table of Contents Index...
Страница 178: ...Great Plains 401 626M 2019 06 11 Table of Contents Index 174 YP2425A Table of Contents Index...
Страница 179: ...Table of Contents Index Table of Contents Index...
Страница 180: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 Table of Contents Index...