VT1500-0324 - VT1500-0924
Preparation and Setup
Great Plains
| 596-381M | 09/12/2022
13
Refer to Figure 3
9. See drawing for correct pins and hole positions for
Category III.
10. Pin upper arm to implement. For category III, install hitch
pin (1) in top hole.
11. Install pin (2) in lower holes.
12. Connect your tractor 3-point to the sub-soiler 3-point
hitch. If using quick hitch be sure sub-soiler locks into
hitch securely.
13. Slowly raise implement. Watch for cab interference.
14. Set your tractor 3-point draft control to float position.
15. Plug lead from implement light harness into tractor
receptacle.
16. Raise tractor 3-point just enough to relieve pressure from
parking stands.
17. Raise and pin up 3-point stands. See “
Store Parking
Stands
” on page 14.
Load Sway Risk:
Adjust 3-point hitch arms and sway blocks to minimize any
side-to-side sway to assure proper tracking in the field and
safe road travel.
18. Storing Parking Stands
19. While holding the parking stand (1), remove the snap lock
pin (2).
20. Slide the stand (1) clear up in stand mount (3) as shown.
21. Install snap lock pin (2) through aligned holes to secure.
2
2
1
2
3
1