
Great Plains | 166-486M | 2019/01/29
28
Spartan
II
607
Operation
5. Extend the fold cylinders to:
Extend the gauge wheels to the raised
position.
Lower the wings.
One wing may reach the ground before the
other. It is common for the unfolding to be
slightly non-symmetrical.
6. Hold the lift circuit at extended for several
seconds after the gauge wheels contact the
ground to:
Make sure the center lock cylinder activates
and disengages the lift lock.
Re-phase the lift cylinder to make sure the lift
cylinders are at the same heights.
7. Set the fold circuit to float or neutral.
Folding
Fold the drill for moves between fields, transporting
over public roads, parking, and storage.
1. Make sure markers, if installed, are fully folded
2. Move the drill to solid, level ground with adequate
overhead and side clearances for the fold
operation.
3. Locate the wing lock bars (1). Make sure they are
not in the wing lock lugs (2).
As needed, rotate the orange wing service lock
handle (3) (top forward) until the locking bar is
raised to and held at vertical.
4. Extend the lift cylinders to fully raise the machine.
Hold at raised for a few seconds. Set the circuit to
neutral. Do not install cylinder lock channels.
i
31142
32458
1
3
2
32458
31143