
PL5500 Planter
Preparation and Setup
Great Plains | 411-633M | 10/21/2021
15
9. Check the oil level on the PTO pump oil reservoir
tank.
10. Check that all hydraulic fittings are tight and dry.
11. Inspect all hoses for damages, wear, and fatigue.
Replace, as needed, before operation.
The PTO Pump assembly includes an oil cooler. The
oil cooler has an electrical harness which needs to
be connected to the tractor battery.
12. Inspect the tractor battery terminal posts,
electrical wires, battery ring terminals, quick
connections, etc. for any wear, damages, rust, or
corrosion. Clean, repair, and replace, as
necessary.
13. Grasp the positive battery ring terminal (a) and
screw into the positive post terminal using the
existing bolt on the corresponding battery post.
14. Grasp the negative battery ring terminal (a) and
screw into the negative post terminal using the
existing bolt on the corresponding battery post.
The tractor battery terminal posts will likely
be marked with a (+) and/or colored red for
positive and with a (-) and/or colored black
for negative.
15. Secure the electrical harness so that it is not
loose, dangling, or otherwise able to become
tangled or dislodged by other moving parts.
a
TP-71564
i
Содержание PL5500
Страница 59: ...Great Plains 411 633M 10 21 2021 52 PL5500 Planter Table of Contents Index Operation ...
Страница 105: ...Table of Contents Index ...
Страница 108: ...Table of Contents Index ...
Страница 109: ...Great Plains Mfg 1525 E North St P O Box 5060 Salina KS 67402 ...